
58
SECTION XI
PHASE 7 OPL SYSTEM DIAGNOSTICS
IMPORTANT: YOU MUST DISCONNECT AND LOCKOUT THE ELECTRIC SUPPLY
AND THE GAS SUPPLY OR THE STEAM SUPPLY BEFORE ANY
COVERS OR GUARDS ARE REMOVED FROM THE MACHINE TO
ALLOW ACCESS FOR CLEANING, ADJUSTING, INSTALLATION, OR
TESTING OF ANY EQUIPMENT PER OSHA
(Occupational Safety and
Health Administration)
STANDARDS.
ALL
major circuits, including door, microprocessor temperature sensor, heat and motor circuits are monitored.
The Phase 7 OPL microprocessor controller (computer) will inform the user, via the light emitting diode (L.E.D.)
display of certain failure messages, along with L.E.D. indicators on the input/output (I/O) board on the back panel
of the front right control door.
A. DIAGNOSTIC (L.E.D. DISPLAY) FAULT MESSAGES
Summary of Contents for AD-310
Page 11: ...7 310 NON TILT GAS MODEL B DIMENSIONS AND COMPONENT LOCATION ...
Page 12: ...8 310 NON TILT STEAM MODEL ...
Page 14: ...10 1 Reassembly Instructions For Gas Dryer Shipped In Two 2 Pieces ...
Page 16: ...12 2 Reassembly Instructions For Steam Dryer Shipped In Two 2 Pieces ...
Page 22: ...18 ...
Page 23: ...19 ...
Page 24: ...20 ...
Page 64: ...60 B I O BOARD INPUT AND OUTPUT L E D INDICATORS ...
Page 80: ...76 ...