background image

WALL PANEL/LINER INSTALLATION (continued)

TIME REQUIRED

3-4 HR

10

1T

 

C - Installing Panels 
 

8.  Sand the backside surface of the wall panels with 60 grit sandpaper. This will increase the bond  

    to the silicone. Remove all dust and dirt with a clean dry cloth.
 9.  Start with panel 2B, apply a generous amount of silicone to the cement board and to the back  

    side of the wall panel. Refer to “Silicone Recommendations” on previous page for applying  

    silicone. Also refer to the manufacturer’s recommendations for application and drying time.

10.  Press the wall firmly into position. Be sure to use spacers between the bottom panel and the  

    shower pan to ensure panel is level. 

(diagram 12)

 11.  Install the remaining panels in the following order: 1B, 1L, 2B, 2L, 1T, 1LT, 2T & 2LT.  

    Match the space between the panels with the rest of the grout lines on the panel.  

    Use spacers if necessary to make the walls square and straight.

diagram 12

THRESHOLD TRIM

TIME REQUIRED

1/2 - 1 HR

11

8

 The threshold trim pieces complete the look of your new shower system. If you purchased a Basic 

Package which does not come with glass, your threshold pieces will be solid, without a channel. If 

you purchased a Supreme Package which comes with glass, the threshold pieces will have a channel 

for the glass panels. No matter what package you ordered there are 2 special cap trim pieces and 2 

special notched bottom left and right pieces.
1.   Locate all the trim pieces and align them on the floor. 

(diagram 13)

 2.  Apply silicone, using a zig-zag pattern, to the cement board along the panel’s edge, approximately  

    4 inches out: to the far outside of the shower pan. 

(diagram 14)

    Do not install the small cap trim pieces if your package includes glass. These trim pieces are to be  

  installed after the glass and door have been installed. If you did not purchase a package  

    with glass, you can install the cap trim pieces now.

3.   Starting with the special bottom threshold piece, place the threshold into position making sure to  

    align the threshold with the vertical plumb line previously drawn on the cement  

 

    board. Apply pressure to the trim piece to bond it to the cement board. The trim piece should be  

    flush with the inside of the shower pan threshold. 

(diagram 15) 

Make sure to align the glass  

    channels in the thresholds with the glass channels in the shower pan. (if glass unit)

4.   Place the remaining trim pieces into position. Make sure to use a level and the plumb line  

    previously drawn on the cement board to align the trim pieces vertically.

Wall thresholds should be flush on the inside and

outside of the pan

See manufacturer’s recommendations for drying time

cap trim pieces

TLC 

TRC 

TLT 

TRT 

TLB 

TRB 

diagram 13

special notched bottom pieces

diagram 14

diagram 15

1B

1L

2T

2L

2B

B races may be required to keep walls flush

cement 

board

2LT

1LT

Summary of Contents for Sistine Stone Neo Corner-Hnf

Page 1: ...Installation Preparation Work which may include plumbing relocation drain location and bathroom demolition Prior to demolition scheduling a contractor or building your shower double check that you hav...

Page 2: ...AINST APPROPRIATE PACKING LIST Make sure you have received all the items necessary for the installation This will also familiarize you with all the parts and hardware you will need to install your sho...

Page 3: ...flush 1 4 cement board 2 x 4 stud metal flange pan diagram 1 floor of pan silicone bead It is easier to check alignment of studs and pan without the drain installed into the pan Place the pan in the p...

Page 4: ...drain collar pan 6 rubber gasket 7 teflon slide ring 8 drain lock nut apply silicone around drain collar sides and under lip floor hole with 2 drain pipe diagram 3 1 Remove the shower pan to a safe l...

Page 5: ...t based product like Wonderboard or Hardibacker may also be used if it meets your local codes Some codes require a vapor barrier to be installed as well We recommend a water vapor barrier of 6 mil pla...

Page 6: ...e extensively bowed they can be easily flattened before installation See trouble shooting section on last page for details B Test Alignment by Dry fitting Wall Panels Liners 1 Place your first bottom...

Page 7: ...proper amount you will need for the project based on your shower size Depending on the size and threshold type of your shower you will need from 10 20 9 8 oz tubes of silicone to complete your shower...

Page 8: ...ordered there are 2 special cap trim pieces and 2 special notched bottom left and right pieces 1 Locate all the trim pieces and align them on the floor diagram 13 2 Apply silicone using a zig zag patt...

Page 9: ...tached to the screw 4 Remove the first set of flat clear washers from the bolt 5 Start with the top hole on the glass door Place the long bolt through the hole in the door keeping the remaining rubber...

Page 10: ...distance from each wall threshold Take all measurements from the outside edges of the glass 3 Measure the positioning of the glass panels to endure they are in the correct position Make sure the glas...

Page 11: ...s your preference 8 After everything is lined up correctly remove the header pieces D Dry Fit Door Header The door can pivot with the hinges on the left or right side depending on your preference We w...

Page 12: ...to the glass panels Be sure to align them to the header center section diagram 26 10 Allow the silicone to dry before continuing with the installation Make sure the glass remains in the proper positio...

Page 13: ...circular motion to avoid dis coloration The stone is naturally waterproof and will not absorb spills or soil simply wipe away with a damp sponge Periodic cleaning with a sponge and warm soapy water w...

Page 14: ...13395 Estelle Street Corona California 92879 Phone 800 454 2284 Fax 951 734 1480 Visit us at www americanbathfactory com NOTES...

Reviews: