background image

diagram 21

diagram 22

glass channel

side section

side section

center section

hinge pin

hole

hinge pin

hole

  4.  Locate the header pieces and lay them out in the correct orientation on the floor. Depending on    

    the size of the shower there will be either 2 or 3 pieces. If your shower is not a square than one  

    piece will be longer than the other.Place the long piece on the longer side and the short piece on  

    the short side. 

(diagram 21)

 

5.  Set the header center section onto the glass panels. 

 

 

6.  Make sure the glass panels are still positioned correctly inside channels. Adjust the panels if    

   necessary. 

(diagram 22)

 

7.  Dry fit the header side pieces and make sure the ends meet with the wall threshold caps  

 

    (not installed) and the glass panels fit in the channels correctly. 

(diagram 22)  

Depending  

 

    on how square the walls are, you may need to sand the edges of the side pieces to make them   

    fit properly. Leave a small gap between the center and side pieces to make a grout joint  

 

    that matches your preference.
  8.  After everything is lined up correctly, remove the header pieces.

D - Dry Fit Door/Header

The door can pivot with the hinges on the left or right side depending on your preference. We will 

illustrate an installation with the hinges on the right side.

  1.  Have one person place the door in its open position by allowing the bottom hinge pin to slide  

    into the hole in the pan threshold. Make sure the bottom hinge has the spacer on the pin.  

  

(diagram 23)

Be sure to keep the door in a vertical position. If the door is not kept 
vertical, damage to the hinge, glass, or pan may occur.

 

  2.  Next, have the other person place the header center section into position. Align the hole in the  

    header center section with the hinge pin and align the glass channels with the glass panels.  

  

(diagram 23)

 

3.  Push the header center section all the way down onto the glass panels and then position the  

    door in its closed position.

  4.  Check for clearance between the door and glass panels and top and bottom of door.  

  

(see next page, diagram 24) 

There should be minimum of 3/16” between the door and  

    panels.if you need to, push the panels into the wall thresholds to increase your gap.
   

diagram 23

11

Summary of Contents for Sistine Stone Neo Corner-Hnf

Page 1: ...Installation Preparation Work which may include plumbing relocation drain location and bathroom demolition Prior to demolition scheduling a contractor or building your shower double check that you hav...

Page 2: ...AINST APPROPRIATE PACKING LIST Make sure you have received all the items necessary for the installation This will also familiarize you with all the parts and hardware you will need to install your sho...

Page 3: ...flush 1 4 cement board 2 x 4 stud metal flange pan diagram 1 floor of pan silicone bead It is easier to check alignment of studs and pan without the drain installed into the pan Place the pan in the p...

Page 4: ...drain collar pan 6 rubber gasket 7 teflon slide ring 8 drain lock nut apply silicone around drain collar sides and under lip floor hole with 2 drain pipe diagram 3 1 Remove the shower pan to a safe l...

Page 5: ...t based product like Wonderboard or Hardibacker may also be used if it meets your local codes Some codes require a vapor barrier to be installed as well We recommend a water vapor barrier of 6 mil pla...

Page 6: ...e extensively bowed they can be easily flattened before installation See trouble shooting section on last page for details B Test Alignment by Dry fitting Wall Panels Liners 1 Place your first bottom...

Page 7: ...proper amount you will need for the project based on your shower size Depending on the size and threshold type of your shower you will need from 10 20 9 8 oz tubes of silicone to complete your shower...

Page 8: ...ordered there are 2 special cap trim pieces and 2 special notched bottom left and right pieces 1 Locate all the trim pieces and align them on the floor diagram 13 2 Apply silicone using a zig zag patt...

Page 9: ...tached to the screw 4 Remove the first set of flat clear washers from the bolt 5 Start with the top hole on the glass door Place the long bolt through the hole in the door keeping the remaining rubber...

Page 10: ...distance from each wall threshold Take all measurements from the outside edges of the glass 3 Measure the positioning of the glass panels to endure they are in the correct position Make sure the glas...

Page 11: ...s your preference 8 After everything is lined up correctly remove the header pieces D Dry Fit Door Header The door can pivot with the hinges on the left or right side depending on your preference We w...

Page 12: ...to the glass panels Be sure to align them to the header center section diagram 26 10 Allow the silicone to dry before continuing with the installation Make sure the glass remains in the proper positio...

Page 13: ...circular motion to avoid dis coloration The stone is naturally waterproof and will not absorb spills or soil simply wipe away with a damp sponge Periodic cleaning with a sponge and warm soapy water w...

Page 14: ...13395 Estelle Street Corona California 92879 Phone 800 454 2284 Fax 951 734 1480 Visit us at www americanbathfactory com NOTES...

Reviews: