A - Inspecting Wall Panels/Liners

Inspecting panels at this point will give you confidence that the wall panels are straight and square from the factory. 

When installing wall panels, you may need to make adjustments to the panels to accommodate for unevenness of your 

existing walls. During the inspection process and/or dry-fitting process, if you have any concerns about the alignment or fit 

of the wall panels, please call us and we will gladly assist you with your install.

1.

Find a large empty area to layout and inspect all panels.

2.

Align all panels and liners to check for straightness. Make sure grout lines are straight and square to each other.

3.

Sistine Stone wall panels are made to be flexible and may have a slight bow. This condition is normal and wall panels

 

will  flatten  out  when  properly  installed.  If  wall  panels  have  been  stored  improperly  or  have  become  excessivly

 

bowed, they can be corrected before installation. 

(See troubleshooting section on last page for details)

B - Dry-fitting Wall Panels/Liners

1.

2. Place the second bottom panel  into position, push the two panels together. Make

sure the grout lines are aligned, again use spacers to make the top of the panel level.

Inspect the spacing between the wall panels and the side casing plumb line.

3. Depending on your cement board alignment, some sanding of the wall panel edges

may be required for a proper fit.

4. Place liners 

L1 

L2 

in position and check for level and length. 

(Dia. 13)

5.

6.

Holding the lower panels and liners in place with screws and blocks or another person, 

place the upper pan

els 

4

 &

 3 

into positi

on. Check the length and overlap alignment. 

Some fitting may be required.

Depending on your faucet selection, you may need to mark and cut out holes for your 

faucet or other accessories 

(i.e. shampoo shelf)

 to fit through before you can place the 

panel into position. Remember "measure twice, cut once", you can cut our walls with 

most cutting tools.

WALL PANEL/LINER INSTALLATION

TIME REQUIRED

3-4 HR

diagram 13

8

diagram 12

diagram 14

5

Place the first bottom pan

el 

 

into position. 

(Dia. 12)

 

Rest the wall panel on the pan 

floor; use spacers between the floor and the panel to make the top of the panel level.

 

C - Installing Panels 

1.

2.

Remove all dust and dirt with a clean dry cloth. This will increase the bond to the 100% 

silicone.

Start with the bottom p

anel 

2

 app

ly a generous amount of 100% silicone to the 

cement board and to the back side of the wall panel. Refer to the manufacturer’s 

recommendations for application and drying time.

3. Press the wall firmly into position. Be sure to use spacers between the bottom panel

and the shower pan to ensure panel is level. 

(dia. 14)

4. Install the remaining panels in the following order:

5. Match the space between the panels with the rest of the grout lines on the panel. Use

spacers if necessary to make the walls square and straight.

2  1  L2  L1  4  3 

Br aces may be required to keep walls flush

DO NOT force the panels or liners to fit in a tight space. This will cause the panels to 

bow or curve and can cause them to break. Due to the resilient flex in the panels 

any bowing will cause the silicone bond to break away from the wall's surface.

See installation video at americanbathfactory.com/pages/videos

Summary of Contents for Medici showers NEO ANGLE

Page 1: ...re a licensed contractor handyman or professional installer that can do it for you Installation time may vary depending on your experience complexity of shower and Pre Install Prep Work which may incl...

Page 2: ...secure the pan in place dia 1 PRE INSTALLATION TEAR DOWN TIME 8 16 HRS 1 INSIDE NOTE Due to some rough handling during shipping water test pan before installation to check for any issues PRE INSTALLAT...

Page 3: ...f triple studs overhang 11 minimum gap required for shampoo shelf diagram 2 1 Locate the drain assembly to install into pan 2 3 4 Take drain assembly apart and set parts 1 4 in a safe place for instal...

Page 4: ...prior to the cement board To do this staple plastic so that it hangs 1 above the floor DO NOT USE AN ELASTOMERIC WATERPROOFING MEMBRANE ON YOUR CEMENT BOARD such as RedGard Roofing nails may be used...

Page 5: ...Place the first side casing into position making sure to align with the vertical plumb line previously drawn on the cement board Apply pressure to the side casing to bond it to the cement board The s...

Page 6: ...ws and blocks or another person place the upper panels 4 3 into position Check the length and overlap alignment Some fitting may be required Depending on your faucet selection you may need to mark and...

Page 7: ...existing walls or panels Sistine Stone wall panels are made to be flexible and may have a slight bow This condition is normal and wall panels will flatten out when properly installed If wall panels h...

Page 8: ...and straight to each other Measure diagonally to check for straightness Make any necessary adjustments dia 21a 3 Locate the header pieces and lay them out in the correct orientation on the shower pan...

Page 9: ...stallation with the hinges on the right side 1 Have one person place the door in its open position by allowing the bottom hinge pin to slide into the threshold hinge bracket Make sure the bottom hinge...

Page 10: ...glass panels are in the proper position 5 Allow the silicone to dry You can silicone any gaps between the stone and glass to ensure water tightness G Install Glass Door Header 1 2 3 Have someone help...

Page 11: ...t holes Insert the anchor through pilot holes apply silicone to back edge of shelf and then screw shelf to wall 4 You can install the soap dish with silicone a Silicone Installation Apply silicone to...

Page 12: ...over the cracked seam when it is installed The grout will correct the problem you will not be able to tell the crack was ever there Scratches Blemishes Can be removed by wet sanding the tile surface...

Reviews: