background image

WALL PANEL/LINER INSTALLATION

.

A - Inspecting Wall Panels/Liners

Inspecting panels at this point to make sure wall panels shipped OK from the factory. When installing wall panels, 

you may need to make adjustments to the panels to accommodate for unevenness of your existing walls or panels. 

Sistine Stone wall panels are made to be flexible and may have a slight bow. This condition is normal and wall 

panels  will  flatten  out  when  properly  installed.  If  wall  panels  have  been  stored  improperly  or  have  become 

excessively bowed, they can be corrected before installation. 

(See troubleshooting section on last page for details)

B - Wall Configuration

Horizontal Single Liner Model

6" Liner

L

2

L

1

2

1

4

3

6

Wall Panels With Top Molding 

Summary of Contents for Medici showers NEO ANGLE

Page 1: ...re a licensed contractor handyman or professional installer that can do it for you Installation time may vary depending on your experience complexity of shower and Pre Install Prep Work which may incl...

Page 2: ...secure the pan in place dia 1 PRE INSTALLATION TEAR DOWN TIME 8 16 HRS 1 INSIDE NOTE Due to some rough handling during shipping water test pan before installation to check for any issues PRE INSTALLAT...

Page 3: ...f triple studs overhang 11 minimum gap required for shampoo shelf diagram 2 1 Locate the drain assembly to install into pan 2 3 4 Take drain assembly apart and set parts 1 4 in a safe place for instal...

Page 4: ...prior to the cement board To do this staple plastic so that it hangs 1 above the floor DO NOT USE AN ELASTOMERIC WATERPROOFING MEMBRANE ON YOUR CEMENT BOARD such as RedGard Roofing nails may be used...

Page 5: ...Place the first side casing into position making sure to align with the vertical plumb line previously drawn on the cement board Apply pressure to the side casing to bond it to the cement board The s...

Page 6: ...ws and blocks or another person place the upper panels 4 3 into position Check the length and overlap alignment Some fitting may be required Depending on your faucet selection you may need to mark and...

Page 7: ...existing walls or panels Sistine Stone wall panels are made to be flexible and may have a slight bow This condition is normal and wall panels will flatten out when properly installed If wall panels h...

Page 8: ...and straight to each other Measure diagonally to check for straightness Make any necessary adjustments dia 21a 3 Locate the header pieces and lay them out in the correct orientation on the shower pan...

Page 9: ...stallation with the hinges on the right side 1 Have one person place the door in its open position by allowing the bottom hinge pin to slide into the threshold hinge bracket Make sure the bottom hinge...

Page 10: ...glass panels are in the proper position 5 Allow the silicone to dry You can silicone any gaps between the stone and glass to ensure water tightness G Install Glass Door Header 1 2 3 Have someone help...

Page 11: ...t holes Insert the anchor through pilot holes apply silicone to back edge of shelf and then screw shelf to wall 4 You can install the soap dish with silicone a Silicone Installation Apply silicone to...

Page 12: ...over the cracked seam when it is installed The grout will correct the problem you will not be able to tell the crack was ever there Scratches Blemishes Can be removed by wet sanding the tile surface...

Reviews: