background image

8

diagram 20b

diagram 21

GP

GP

GR

glass panel

glass panel

pan

threshold

glass panel

glass panel

inside

shower

 

¼" gap

¼" gap

note: measurements taken from outside edges of glass

¼" gap

3/8" door to pan 

threshold clearance

shower pan

top of shower pan threshold

glass panels

GP

GD

GP

P

diagram 21a

glass channel

center section

side section

side section

diagram 22

inside

shower

 

Side View of Header

diagram 23

E

 - Dry Fit Door/Header

The door can pivot with the hinges on the left or right side depending on your 

preference. We will illustrate an installation with the hinges on the right side.

1. Have one person place the door in its open position by allowing the bottom

hinge pin to slide into the threshold hinge bracket

Make sure the bottom

hinge has the spacer on the pin.

GP

GD

diagram 20a

Be sure to keep the door in a vertical position. If the door is not 

kept vertical, damage to the hinge, glass, or pan may occur.

D - Install Threshold Hinge Bracket.

Next, Install Threshold Hinge Bracket. (dia. 15). Decide  what side do you want the door 

to open, left or right? Place bracket into notch of pan threshold step and tight to the 

glass panel. Use 1/8-inch drill to pre-drill screw holes. screw in the two screws.

 Apply 

silicon and place  bracket on top, then insert and tighten screws.

diagram 15

Summary of Contents for Medici showers NEO ANGLE

Page 1: ...re a licensed contractor handyman or professional installer that can do it for you Installation time may vary depending on your experience complexity of shower and Pre Install Prep Work which may incl...

Page 2: ...secure the pan in place dia 1 PRE INSTALLATION TEAR DOWN TIME 8 16 HRS 1 INSIDE NOTE Due to some rough handling during shipping water test pan before installation to check for any issues PRE INSTALLAT...

Page 3: ...f triple studs overhang 11 minimum gap required for shampoo shelf diagram 2 1 Locate the drain assembly to install into pan 2 3 4 Take drain assembly apart and set parts 1 4 in a safe place for instal...

Page 4: ...prior to the cement board To do this staple plastic so that it hangs 1 above the floor DO NOT USE AN ELASTOMERIC WATERPROOFING MEMBRANE ON YOUR CEMENT BOARD such as RedGard Roofing nails may be used...

Page 5: ...Place the first side casing into position making sure to align with the vertical plumb line previously drawn on the cement board Apply pressure to the side casing to bond it to the cement board The s...

Page 6: ...ws and blocks or another person place the upper panels 4 3 into position Check the length and overlap alignment Some fitting may be required Depending on your faucet selection you may need to mark and...

Page 7: ...existing walls or panels Sistine Stone wall panels are made to be flexible and may have a slight bow This condition is normal and wall panels will flatten out when properly installed If wall panels h...

Page 8: ...and straight to each other Measure diagonally to check for straightness Make any necessary adjustments dia 21a 3 Locate the header pieces and lay them out in the correct orientation on the shower pan...

Page 9: ...stallation with the hinges on the right side 1 Have one person place the door in its open position by allowing the bottom hinge pin to slide into the threshold hinge bracket Make sure the bottom hinge...

Page 10: ...glass panels are in the proper position 5 Allow the silicone to dry You can silicone any gaps between the stone and glass to ensure water tightness G Install Glass Door Header 1 2 3 Have someone help...

Page 11: ...t holes Insert the anchor through pilot holes apply silicone to back edge of shelf and then screw shelf to wall 4 You can install the soap dish with silicone a Silicone Installation Apply silicone to...

Page 12: ...over the cracked seam when it is installed The grout will correct the problem you will not be able to tell the crack was ever there Scratches Blemishes Can be removed by wet sanding the tile surface...

Reviews: