Amana PGB**C Installation Instructions Manual Download Page 18

18

XIII. Accessories and Functional
Parts

Sheet Metal Accessories

Additional Amana accessories, as described in Table 4,
can be purchased to fit specific application needs. Ac-
cessories can be ordered by the part numbers in the
table and each accessory includes its own separate
instructions.

Accessory

Duct Transition Over/Under

Horizontal Duct Covers

Coil Guard Kit 

Compressor Sound Blanket

Horizontal Filter Kit

Propane Gas Conversion Kit

High Altitude Kit

Table 4

Accessory List

Functional Parts

Blower Housing

Flame Roll-Out Switch

Blower Motor

Gas Orifice

Blower Wheel

Heat Exchanger

Burner

High Limit Switch

Compressor

Secondary Limit

Condenser Coil

Ignitor/Flame Sensor

Condenser Fan Blade Induced Draft Motor
Condenser Fan Motor Pressure Switch
Contactor

Pressure Switch Hose

Evaporator Coil

Transformer

Fan Timer Board

Figure 16

Functional Parts List

General Information

1. Refer to the description in Figure 16 when ordering
any of the listed functional parts. Be sure to provide the
unit model, manufacturing, and serial numbers with the
order.

2. Although only functional parts are shown in Figure
16, all sheet metal parts, doors, etc. may be ordered by
description.

3. Parts are available from your Amana distributor.

Summary of Contents for PGB**C

Page 1: ...afety practices follow them The precautions listed in this Installation Manual should not supersede existing practices but should be considered as supplemental information ATTENTION INSTALLING PERSONN...

Page 2: ...shut off turn off the manual gas control valve to the unit before shut ting off the electrical supply WARNING To prevent death personal injury or prop erty damage do not use this unit if any part of t...

Page 3: ...rn air entering the unit must be between 50 F and 100 F Provisions must be made for adequate combustion and ventilation air in accordance with Section 5 3 Air for Combustion and Ventilation of the Nat...

Page 4: ...ht bill or indemnity in lieu thereof c Original invoice or certified copy thereof showing trade and other discounts or reductions d Copy of the inspection report issued by carrier representative at th...

Page 5: ...propane gas and for altitude adjust ments Piping IMPORTANT NOTE To avoid possible unsatisfactory operation or equipment damage due to under firing of equipment do not undersize the natural propane ga...

Page 6: ...ring which may result in heat failure This unit and its shut off valve must be disconnected from the gas supply dur ing any pressure testing of that system at test pressures in excess of 1 2 PSIG 3 48...

Page 7: ...er gas pressure depends on three main factors 1 Vaporization rate which depends on a tempera ture of the liquid and b wetted surface area of the container or containers 2 Proper pressure regulation 3...

Page 8: ...re 5 V Electrical Wiring Locating The Thermostat Thermostat should be mounted 5 feet above the floor on a vibration free inside wall in a room or a hallway that has good air circulation Movement of ai...

Page 9: ...sformer primary lead and induced draft blower mo tor leads as shown on the unit wiring diagram Heat Anticipator Setting The heat anticipator in the room thermostat must be correctly adjusted to obtain...

Page 10: ...duct should be provided with an access panel This access should be large enough to inspect the air chamber downstream from the heat exchanger for any smoke or combustion gas leaks A cover should be ti...

Page 11: ...ocated and other spaces of the building Turn on clothes dryers and any appliance not connected to the common venting system Turn on any exhaust fans such as range hoods and bathroom exhausts so they w...

Page 12: ...ll Out Protector Figure 9 Rollout Protection IX Heating Sequence of Operations Normal Sequence of Operation Heating 1 Thermostat calls for heat The combustion blower is immediately energized 2 The pre...

Page 13: ...Figure 12 With Power And Gas On 2 Put unit into heating cycle and turn on all other gas consuming appliances Figure 12 Measuring Inlet Gas Pressure Alternate Method Secondary Limit Control On the PGB...

Page 14: ...per cubic foot as deter mined by Step 2 then Input 1000 x 3600 0 34 106 000 BTU per Hour NOTE BTU content of the gas should be obtained from the gas supplier This measured input must not be greater t...

Page 15: ...ishing phases of construction on a new struc ture This type of use may result in pre mature failure of the unit due to extremely low return air temperatures and expo sure to very dirty atmospheres To...

Page 16: ...d with water thoroughly dried and sprayed with a filter adhesive before being reinstalled Filter adhesives may be found at many hardware stores Permanent filters should last several years However shou...

Page 17: ...sonal injury due to electrical shock do not remove any in ternal compartment covers or attempt any adjustment Contact a qualified ser vicer at once if an abnormal flame ap pearance should develop At l...

Page 18: ...ng Flame Roll Out Switch Blower Motor Gas Orifice Blower Wheel Heat Exchanger Burner High Limit Switch Compressor Secondary Limit Condenser Coil Ignitor Flame Sensor Condenser Fan Blade Induced Draft...

Reviews: