WBSn-2400 and WBSn-2450 System Manual
Chapter 2 - Base Station InstallationConnecting and Sealing Omni Antennas (if applicable)
Chapter 2 - Base Station Installation
Connecting and Sealing Omni Antennas (if applicable)
17
2.10
Connecting and Sealing Omni Antennas (if
applicable)
1
Screw the three antennas into the three N-type connectors on the bottom of the WBSn base station
unit. Do not use excessive force.
2
After the antennas are connected, use the supplied isolation tape to cover the N-Type connectors and
the lower part of the antennas to ensure IP-68 compliant protection against dust and water:
2.11
Completing the Outdoor Installation
1
Firmly connect the grounding cable to a protective ground (earth) connection.
2
Route the Ethernet cable to the intended location of the PoE Injector. Use proper means to secure the
cable to the pole/tower, walls, and other objects as required.
Without Extender (vertical pole)
With Extender (horizontal pole)
Figure 2-5: Pole Mounting, with/without an Extender
NOTE!
Only the antennas supplied in the original package should be used.
The antennas should only be connected after completing the installation procedure and prior to
powering the unit.
All three antennas must be connected.
a
Cut 18 cm of the attached splicing tape.
b
Stretch and wrap the tape in an even, half overlapping manner
around the antenna and N-Type connector. Cover this with a layer of
vinyl plastic tape.
To complete the outdoor installation: