Use only skilled technicians for site preparation and installation of the turnstile using Alvarado’s instructions. Refer to 

the footprint and plan drawings [Figures 1 & 2] to determine the installation location and conduit requirements. See 

Appendix A on page

 

24 for footprint and plan drawings for the Portable Base Turnstile.

•  Use a level, solid concrete pad with minimum size of 4' x 4' and a minimum thickness of 4" (101.5mm).
•  Do not install the turnstile on asphalt.

•  There must 2" (50.8mm) of clearance between the turnstile arm and the adjacent turnstile or barrier [Figure 1].

•  Stub up conduit in accordance with local electrical codes.

•  Always verify the layout of the turnstile(s) before installation.

Site Preparation

Fig. 2

Fig. 1

Slab Requirements

Space & Conduit Requirements

CONDUIT HOLE

2X 5 [127]

0

37 [940]

39.2 [997]

3.8 [95]

43 [1092]

2X 4.5 [114]

6 [152]

2X 1.1 [28]

0

2X 8.4 [213]

9.5 [241]

2X 2.3 [57]

2X 3.4 [864]

4X .5 [13] THRU

ANCHORING

LOCATIONS

Adjacent Barrier or 

Turnstile

2" [50.8]

OPENING

2X 34 [864]

OPENING

Summary of Contents for TAS12-EDM

Page 1: ...Colony Street Chino CA 91710 Telephone 1 909 591 8431 Fax 1 909 628 1403 support alvaradomfg com www alvaradomfg com PUD4005R1 0 Installation Instructions TAS12 EDM TAS12P EDM TAS12 EDM TAS12P EDM MO...

Page 2: ...Installation Inspection 14 Post Installation Functions Check 14 Power On 15 Perform TAS12 Device Tests 16 Scan a Sample Barcode Ticket 18 Validate RFID Media Optional on TAS12P EDM only 18 Test Drop...

Page 3: ...llation process it is the installer s responsibility to provide the project or site manager with these Installation Instructions and the Operation and Maintenance Instructions Safety Precautions The f...

Page 4: ...32 Allen Wrench 5 16 Open Wrench Wireless antenna only 2 Phillips Head Screwdriver Precision Flat Head Screwdriver Torque Wrench ft lbs 9 16 Socket Hammer Tape Measure Chalk 5 8 ID Washer Shims Clear...

Page 5: ...nd contact Alvarado Additional copies of this installation manual can be found at www alvaradomfg com Parts List NOTE TAS12 EDM Turnstile Qty 1 TAS12P EDM TAS12 Qty 1 Wireless Antenna Qty 1 Wireless O...

Page 6: ...ing to an AC outlet using an exterior mounted AC inlet and extension cord Applicable to portable installations only Before you begin understand how your turnstiles will be powered This manual focuses...

Page 7: ...ect cables that interconnect the turnstile and TAS12 unit 6 Connect the Ethernet cable for network communication if applicable 7 Inspect installation 8 Perform a post installation functions check 9 Ha...

Page 8: ...vel solid concrete pad with minimum size of 4 x 4 and a minimum thickness of 4 101 5mm Do not install the turnstile on asphalt There must 2 50 8mm of clearance between the turnstile arm and the adjace...

Page 9: ...TAS12 EDM TAS12P EDM Installation Instructions PUD4005R1 0 For Assistance support alvaradomfg com 1 909 591 8431 Page 9 Space Conduit Requirements cont L Fig 3a Fig 3b Fig 3c...

Page 10: ...ith a 5 8 concrete bit drill each anchor hole to a depth of 3 76 2mm 7 Using a shop vac vacuum debris from the anchor holes before installing the anchors If the holes are not clear of debris the ancho...

Page 11: ...ry Power Wiring Instructions Use a licensed electrician for the following steps and adhere to all applicable local codes MAKE SURE PRIMARY POWER IS TURNED OFF AT THE BREAKER WARNING Terminal 110V 220V...

Page 12: ...e base plate will act as a guide the dove tail plates will slide under the base plate until they are flush with the front edge of the base plate 6 From the underside of the lid use a 5 32 Allen wrench...

Page 13: ...TAS12P EDM Only Plug the USB printer cable into a USB port C or E 4 Ethernet Wired communication only Used for communication with local area network Plug the Ethernet cable into the Ethernet port D 5...

Page 14: ...may lead to a short Perform the following checks to verify the turnstile is performing properly Function checks are included for optional peripherals i e RFID mag stripe reader printer and may not be...

Page 15: ...will take approximately 15 seconds to 1 minute During boot up The attendant notification lights will flash red while establishing communication with the GateLink 10 server Figure 14 The arms will unde...

Page 16: ...e Tests The use of a stylus is recommended for all touch screen operations If the default Login ID is invalid obtain a valid Login ID from the system administrator 1 Make sure the turnstile is online...

Page 17: ...the turnstile will re lock after 20 seconds If the rotation occurs in the entry direction a count will appear in Forward Rotation Count If the rotation occurs in the exit direction a count will appea...

Page 18: ...pad facing up and towards the turnstile Figure 18 When validated a chime will sound a PLEASE ENTER graphic will display on the TAS12 screen and the attendant notification lights will show GREEN promp...

Page 19: ...nstile and verify the arms reset and lock in the home position A B C D 4 5 6 7 8 8 7 6 5 4 UNL DIME X XX E A AP PROPRIETARY AND CONFIDENTIAL THE INFORMATION CONTAINED IN THIS DRAWING IS THE SOLE PROPE...

Page 20: ...rection If you have User Notification Lights installed verify the GREEN light is illuminated 2 Turn key to the CENTER position for Controlled Passage mode Verify the arms are locked in the appropriate...

Page 21: ...r Reset Lock Counter REVISIONS REV DESCRIPTION DATE BY A B C D 1 2 3 4 5 6 7 8 8 7 6 5 4 3 2 1 N A DRAWN CHECKED ENGR DATE NAME TITLE SIZE B DWG NO SCALE 1 4 UNLESS OTHERWISE SPECIFIED DIMENSIONS ARE...

Page 22: ...t Drop Arm functionality Test Key Override operation Optional Test counter operation Optional 5 Battery Operation Verify battery is charging properly after being plugged into an AC power source Portab...

Page 23: ...leg Recharge the battery if under 50 charge Primary power wiring is connected improperly Refer to Primary Power Wiring Instructions on page 11 Ensure wiring is connected accordingly TAS12 power conne...

Page 24: ...tighten the four 4 set screws using a 1 8 Allen wrench Figure A1 3 Attach the TAS12 unit Proceed to TAS12 Installation section on page 12 4 To maneuver the turnstile Firmly grab the turnstile handle S...

Page 25: ...bushing 1 and the chuck 2 over the cable White chuck a 6 0 11 0 mm 0 236 0 433 Black chuck b 9 5 15 0 mm 0 374 0 59 VDE 9 5 14 0 mm 0 374 0 551 Prepare the cable as shown Cable O D 6 0 15 0 mm 0 236 0...

Page 26: ...les Proceed to the Post Installation Functions Check on page 14 AC Inlet Installing Neutrik Connector to AC Cord cont Fasten bushing by means of a fork wrench 7 8 SW 22 min Torque 2 5 Nm 1 8 lb ft E E...

Page 27: ...e POWER button on the battery to display charge level When all 5 red LEDs are lit the battery is fully charged Figure A7 Refer to Operation and Maintenance Instructions for more information on chargin...

Page 28: ...12 EDM TAS12P EDM Installation Instructions Page 28 For Assistance support alvaradomfg com 1 909 591 8431 PUD4005R1 0 Portable Base Turnstile Plan Elevation and Footprint Drawing L Fig A8 Fig A9 Fig A...

Page 29: ...EDM TAS12P EDM Installation Instructions PUD4005R1 0 For Assistance support alvaradomfg com 1 909 591 8431 Page 29 Revision Date Author Description 1 0 2 24 2017 A Flores Original document Revision Hi...

Page 30: ...1710 Telephone 909 591 8431 Fax 909 628 1403 support alvaradomfg com www alvaradomfg com 2017 Alvarado Manufacturing Company Inc This work may not be reproduced published or redistributed in whole or...

Reviews:

Related manuals for TAS12-EDM