background image

Supervisor 3000 Installation Instructions

Page 38 

For assistance: [email protected]  +1 (909) 591-8431 PUD3628R1-2

24VDC 

 

CONDUIT HOLES 

110 / 220VAC 

 

CONDUIT HOLE 

Power Supply Enclosure Dimensions

15.80[401.4]

9.50[241.3]

6.23[158.1]

Fig. D7

Dimensions

Summary of Contents for SU3000

Page 1: ...Inc 12660 Colony Street Chino CA 91710 Phone 1 909 591 8431 Fax 1 909 628 1403 support alvaradomfg com www alvaradomfg com PUD3628R1 2 SUPERVISOR 3000 SU3000 Optical Turnstile with Motorized Barrier...

Page 2: ...t 14 Baseplate Assembly Optional 15 Installation Instructions 16 Anchoring the Turnstile 16 Internal Card Reader Installation 18 Wiring Instructions 19 Primary Power 19 Crossover Cable 19 I O Control...

Page 3: ...Alvarado parts to repair a damaged turnstile Closely follow the handling instructions for moving or lifting the turnstile during installation Power off the turnstile before connecting or disconnectin...

Page 4: ...er Cabinets are used to create additional lanes for multi lane configurations Each additional lane includes the parts below Single Lane Parts List Center Cabinet Parts List Per Center Cabinet Concrete...

Page 5: ...status display that communicates lane status to the user A card reader is normally installed during installation underneath the lid below the user status display Center cabinets contain both master an...

Page 6: ...enabled Running Ethernet cabling to the SU3000 provides a number of benefits 1 It allows implementation of Alvarado s TCP IP control and monitoring software 2 It allows easy implementation of SU3000...

Page 7: ...w Footprint Drawing Fig 3 28 Single Lane Plan Elevation Footprint Drawing For ease of installation and servicing Alvarado recommends a minimum of 6 of space between the cabinets and adjacent walls or...

Page 8: ...lan View Footprint Drawing Fig 4 36 Single Lane Plan Elevation Footprint Drawing 0 2X 1 3 32 2X 1 4 35 1 8 44 2X 1 3 32 2X 1 4 35 1 8 44 0 2 51 7 7 196 16 7 424 2X 19 9 506 2 51 7 7 196 16 7 424 2X 19...

Page 9: ...ggests the use of surge protection on the high voltage power line to further protect electronics Fig 5 SU3000 Conduit Lines For multi lane conduit requirements refer to Appendix B on Page 33 NOTE Seal...

Page 10: ...inning the installation Card readers or other physical access devices may be installed in the reveal under the lid on either or both right hand sides of the lane Card readers physical access devices a...

Page 11: ...panel with the key provided To remove slide each unlocked end panel up slightly and then pull it away from the cabinet See Figure 6 for more details When moving cabinets into place DO NOT attempt to...

Page 12: ...7 for more details Removing a Side Panel Slide Across Pins Lift to Free Side Panel from Pins FIGURE 4 3 0 2 Removing the Side Pan Removing a Side Panel Slide Across Pins Lift to Fr Panel fro FIGURE 4...

Page 13: ...ws under the lid the thumbscrews are located at the end of the cabinet two on each end there is a total of 4 thumbscrews and remove the lid by lifting the lid carefully off the turnstile See Figure 8...

Page 14: ...Secondary Controller Side Main Controller Side Secondary Controller Side Main Controller Side Secondary Controller Side Main Controller Side INCORRECT INCORRECT Main Controller Side Secondary Control...

Page 15: ...ntrols must be accessible and provided to the turnstile The side plate on the baseplate must be removed in order to provide external power data or the side plate may be drilled with appropriate holes...

Page 16: ...optimum performance Use the following procedure to square each cabinet with respect to the floor and other cabinets A Measure the distance from the inside wall of one cabinet to the inside wall of th...

Page 17: ...of the anchor must be inserted into the hole first Use a hammer to tap the anchors into place if needed Ensure that the anchors are flush with the concrete floor 6 If not already done pull all wires A...

Page 18: ...Figure 17 4 Install the card reader per manufacturer s instructions If the distance between the installed card reader and top channel lid exceeds the read range of the card reader shims may be used to...

Page 19: ...des The primary wiring lines for 110VAC and 220VAC consist of the following Terminal 110V 220V Ground Green Green Yellow Neutral White Blue Line Black Brown 1 Locate the pre installed power terminal b...

Page 20: ...dry contacts SDC All input signals must be normally open N O voltage free dry contacts with the exception of the fire alarm input which can be configured via jumper on the I O control board to accept...

Page 21: ...for one authorized passage until passage occurs or timeout 10 EXTALRX Unauthorized Presence Exit MDC An output occurs when there is entry into the lane area from the exit direction without authorizati...

Page 22: ...Key Control If this option has been ordered for your turnstiles two 3 position key switches are installed on the turnstile Turning the key to one of the three positions allows each turnstile direction...

Page 23: ...ate the ENTPAS and GND terminals 2 Using a wire jumper connect the ENTPAS and GND terminals Figure 22 Exit Direction 1 Locate the EXTPAS and GND terminals 2 Use a wire jumper to connect the EXTPAS and...

Page 24: ...ation on SU3000 passage modes can be found in the SU3000 User Guide Flashing Passage Mode Description User Status Display Open Closed Status Light Controlled Passage The barrier arms are closed securi...

Page 25: ...to Appendix A on Page 29 for instructions on setting the barrier arm Home Position The keys to power the turnstile ON OFF are packaged in the hardware box that was shipped with the turnstile Powering...

Page 26: ...ntry Exit Authorized Entry Exit Unsecured Side Unauthorized Entry shown Authorized Entry shown Secured Side Unsecured Side TEST PROCEDURE TURNSTILE RESPONSE Enter the turnstile without authorization U...

Page 27: ...e turnstile Barriers close after passage completion Enter the turnstile User Status Light red icon is illuminated Open Closed Status Light is red Unauthorized Entry alarm sounds Barriers remain closed...

Page 28: ...ning the key to one of three positions overrides all existing settings placing the turnstile in Controlled Passage mode Free Passage mode or No Passage mode depending on the orientation of the key Ref...

Page 29: ...arch programs and files field 5 Enter the following command ping XXX XXX X XXX where XXX XXX X XXX is the IP address of the turnstile Figure 29 6 A successful ping will result in the message shown in...

Page 30: ...tioning properly Auditory alarms are playing back correctly Barrier arms move smoothly between the open and closed positions 3 Access Control Integration Installed card readers are successfully readin...

Page 31: ...DC fuse on the motor controller board Locate the motor controller board fuses Figure 31 Using a multimeter check the 24VDC 6 3A fuse for continuity If the fuse is blown contact Alvarado for replacemen...

Page 32: ...l operation mode 2 Press the Test Mode button for two seconds The D2 LED will be lit solid You are now in test mode Figure A1 3 Move the barrier arm a couple of inches in both directions and then plac...

Page 33: ...uration Three Lane Configuration LANE 2 LANE 2 LANE 3 LANE 1 LANE 1 Master Cabinet Master Cabinet Center Cabinet Center Cabinet Slave Cabinet Center Cabinet Slave Cabinet Symbology Description Conduit...

Page 34: ...not provided Wire gauge recommendations for 30 50 and 100 ft runs are provided on Page 36 If your installation requires runs beyond 100 ft ensure wire gauge is appropriate and in compliance with local...

Page 35: ...onduit holes on the enclosure Figure C3 4 Locate the pre installed primary power terminal block Figure C3 There is one primary power terminal block per enclosure 5 Attach each primary power wire to th...

Page 36: ...urnstiles Fig C4 Power Supply Output Terminal Block Fig C5 Turnstile Power Terminal Block The 24VDC V and GND V terminals are common NOTE If connecting to multiple turnstiles it is recommended to labe...

Page 37: ...ort alvaradomfg com 1 909 591 8431 Page 37 LANE 1 MASTER CABINET CENTER CABINET SLAVE CABINET CENTER CABINET LANE 2 LANE 3 110VAC 220VAC INPUT POWER SUPPLY ENCLOSURE 24VDC OUTPUT TO CIRCUIT BREAKER Ex...

Page 38: ...ation Instructions Page 38 For assistance support alvaradomfg com 1 909 591 8431 PUD3628R1 2 24VDC CONDUIT HOLES 110 220VAC CONDUIT HOLE Power Supply Enclosure Dimensions 15 80 401 4 9 50 241 3 6 23 1...

Page 39: ...ble Connection Diagrams MASTER SLAVE Master Cabinet Slave Cabinet SLAVE SLAVE MASTER MASTER Master Cabinet Center Cabinet Slave Cabinet LANE 1 LANE 2 SLAVE SLAVE SLAVE MASTER MASTER MASTER Master Cabi...

Page 40: ...0 05 20 14 A Flores Original document 1 1 07 14 14 A Flores Added Configuring Passage Modes section 1 2 11 13 15 A Flores Updated crossover cable length to 8 Appendix B Multi Lane Conduit Requirements...

Page 41: ...This page intentionally left blank...

Page 42: ...2014 Alvarado Manufacturing Company Inc This work may not be reproduced published or redistributed in whole or in part without the express prior written permission of Alvarado...

Reviews: