![Alton ABCEDOCT1010 Instruction Manual Download Page 27](http://html1.mh-extra.com/html/alton/abcedoct1010/abcedoct1010_instruction-manual_2912725027.webp)
27
Roof Felting
9
Lay the first LH piece of roof felt
onto the ply roof, this should
have about 50mm overhang at
the bottom of the roof. Using
the clout nails provided fix the
sheet to the roof. When nailing
you should position the nail no
more than 20mm from the joint
in the ply sheets so the nail goes
into the roof bar. The nails
should also be no more than
300mm apart (diagram 44).
It’s a good idea to check inside
the building as you go incase
there are any mis-placed nails
that need re-positioning.
Work clockwise around the
building alternating between LH
and RH felt sheets until all the
sheets are in place.
Diagram 44
Diagram 45
N.B.
If you have the
optional slatted roof go to
section 11
now.