Replace the SPI-LPE cover and reinstall the screws.
6.
Using the switch on the top of the SPI-LPE, turn the unit ON to select the standby XM2-
7.
300HP as the power source to the cable plant.
The switch should only be in the ALT position when the service XM2-300HP is connected
to the cable. When in ALT, the standby XM2-300HP is bypassed for service or removal.
Verify the SPI-LPE is properly grounded.
8.
2.0
Installation, continued
2.6
Service Power Inserter (SPI)-LPE, continued
ALT ON
Fig. 2-6, Cover Replaced,
SPI-LPE Switched On
Enclosure
Wall
Paint-cutting
Star Washers
30
017-877-B1-001 Rev. A