Alpha SolarSmart 100 - Technical Data
2.5 GENERAL
2.4 ELECTRICAL
Supply
External Fuse
Power Consumption
Max./Min.
230/240 V ~ 50 Hz
3 A
130 W / 5 W
Solar Cylinder Min. Clearances for Servicing Top
Bottom
Sides
Front
DBU Min. Clearances for Servicing
Top
Bottom
Side
Front
Lift Weight - Cylinder Assembly
Lift Weight DBU
Weight Full and Operational - Cylinder Assembly
Weight Full and Operational - DBU
2.3 INSTALLATION
100 mm
300 mm
10 mm
450 mm
100 mm
100 mm
10 mm
450 mm
36 kg
10 kg
140 kg
19 kg
2.6 LOCATION
1013 mm
596 mm
567 mm
573 mm
400 mm
245 mm
Stainless Steel
Stainless Steel
EPP Foam
50 mm
1.62 kWh/24hr
0.65 W/litre
Zero
Zero
Steam (Water)
Solar Cylinder Dimensions
Height
Width
Depth
DBU Dimensions
Height
Width
Depth
Solar Cylinder - Material
DBU Heat Exchanger - Material
Covers/Insulation Material
Solar Cylinder Insulation Thickness
Standing Energy Loss of Solar Cylinder
Global Warming Potential
Ozone Depletion Potential
Insulation Blowing Agent
The collector installation must be carried out using the kits and connections supplied by Alpha. A maximum of two collectors
can be connected together using the additional collector connection kit.
The DBU should be positioned as close as possible under the solar collector. To enable the system to drain back correctly,
the top of the DBU must be below the bottom of the collectors with a continuous fall to the DBU connections. The pipework
between the collector and DBU can be extended according to the table in Fig. 6, maintaining a maximum vertical distance of
4 m using stainless steel or copper pipe and no soldered joints.
The pipework between the solar cylinder and DBU can be extended to a maximum of 10m, maintaining a maximum vertical
distance of 6 m.
All pipework should be installed using the minimum of bends and restrictions possible and insulated using high temperature
lagging for the pipework between the collector and DBU.