4.6  FIT THE BOILER AND CONNECT THE PIPEWORK

1.  An Alpha combination boiler should be used with the SolarSmart system. Install the boiler as described in the 

instructions supplied with the boiler.

2.  Connect the outlet from the solar cylinder directly to the boiler cold water inlet connection, as shown in Fig. 1.
 

If the boiler has a Seasonality valve fitted it must be fully opened (turn adjusting screw fully clockwise).

 

Notes: 

a.  If the solar system is being fitted to an existing boiler installation, the mains water inlet must be re-routed to 

the inlet of the solar cylinder.

 

 

b.  It is recommended that a thermostatic mixing valve is fitted in the hot water outlet before the taps.

3.  Clip the boiler inlet sensor (supplied with the cylinder) to the boiler inlet pipe as close to the boiler as possible. This 

should be connected to the boiler low voltage terminals 8 and 9 (DHW inlet sensor), the polarity of the connections is 
not important. Refer to the boiler wiring 
diagram.

4.  A self adhesive label is supplied with 

the cylinder. This label 

must 

be located 

adjacent to the domestic hot water 
thermostat knob which must be set 
to max. as shown in Fig. 18. This will 
ensure that the hot water temperature 
from the boiler will be approximately 
60°C.

 

Note: 

The User must be informed of 

the purpose of this label, which 

must 

not 

be removed.

4.7  CONNECT THE PIPEWORK

Refer to Figs. 1 and 19 and the wall templates when connecting the pipework.
1.  Thoroughly flush out all the water pipework.
 

Ensure that all the plastic caps are removed from all connections.

 

Note: 

If soldering union bends, ensure that the bends are not connected to the valves etc., otherwise the internal seals 

may be damaged, (soldered connections cannot be used between the solar collector and DBU, or direct to the cylinder 
connections).

2.  Connect the system pipework to the boiler and the pressure reducing and isolation valves, supplied, in the mains cold 

water inlet to the cylinder. See Figs. 1 and 19.

 

Do not forget that all pressure relief valve 
discharge pipes must be routed clear of 
the boiler and cylinder to a drain in such a 
manner that they may be seen, but cannot 
cause injury to persons or property. Refer to 
Section 3.3 and the boiler instructions. Refer 
to Fig. 4 when connecting to the cylinder 
tundish.

 

This pipework must be installed as 
recommended in Unvented Hot Water 
Storage System, see Section 3.3.

4.  Check  that  the  pressure  in  the  cylinder 

expansion vessel (see Fig. 20) is 2.5 bar. If 
it is not, adjust the pressure to give 2.5 bar. 
Check  when  the  system  is  not  pressurised 
(drained).

5.  Connect the mains water supply and 

complete the pipework. Thoroughly flush 
the water pipework. Refer to Domestic Hot 
Water System, Sections 3.2 and 3.3.

6.  Ensure that all the valves are closed 

(spindle flats at right angles to valve) and do not turn on the water supply at this stage.

bar

0

4

3

2

2.5

3.5

1.5

0.5

1

CORRECT PRESSURE

WHEN COLD

RESET

INFO

RESET

BOOST

bar

°C

x100rpm

IMPORTANT

MUST

This Combi boiler is fitted to an

Alpha Solar system and the domestic

hot water thermostat

always be

set at maximum

Fig. 18

Fig. 19

Water outlet

to boiler

15 mm

Cold water

inlet

15 mm

Return from

DBU

15 mm

Flow to

DBU

15 mm

Compression fittings only

Cold water
inlet filter

Tundish outlet

Summary of Contents for SolarSmart 100

Page 1: ...ions have been carefully prepared but we reserve the right to alter the specification at any time in the interest of product improvement Alpha Therm Limited 2014 Part No 1 032744 ST15 000233 0314 D337...

Page 2: ...emedial or improvement work identified during the course of commissioning or servicing work Refer to the manufacturer s helpline where assistance is needed Report product faults and concerns to the ma...

Page 3: ...t of the Environment i e Approved Document L1 Building Standards Scotland Consolidation Regulations issued by the Scottish Development Department UK Water Regulations Byelaws Scotland Health Safety Do...

Page 4: ...ction Return Connection Max Working Pressure Heat Exchanger Content Collector Circuit Flow Connection Return Connection Max Working Pressure Vessel Size Max Filled Content Case Insulation 2 2 SOLAR CO...

Page 5: ...Energy Loss of Solar Cylinder Global Warming Potential Ozone Depletion Potential Insulation Blowing Agent The collector installation must be carried out using the kits and connections supplied by Alp...

Page 6: ...e 11 Expansion vessel 12 Immersion heater boss use Alpha immersion kit only 13 Drain point for cylinder 14 Pressure relief valve 15 Inlet filter 16 Pressure reducing valve 17 Tundish 18 Isolation valv...

Page 7: ...e in 15 mm copper pipe and be as short as possible Where possible the pipework should be insulated to reduce heat loss Thoroughly flush out the mains water supply pipe before connecting it to the boil...

Page 8: ...is 9 m Subtract the resistance for four 22 mm elbows of 0 8 m each 3 2 m Therefore the maximum permitted length equates to 9 3 2 5 8 m 5 8 m is less than the actual length of 7 m therefore calculate...

Page 9: ...itch or cylinder control utilizing mains electricity The bottom of the solar cylinder must be located within 6 metres vertically of the top of the drain back unit Dimensions The dimensions of the cyli...

Page 10: ...to the DBU The pipework must be insulated with high temperature insulation Dimensions The dimensions of the DBU and clearances required for servicing are shown in Fig 5 Fig 5 DBU Connections A Return...

Page 11: ...g from the sun One solar collector is required upto a maximum of two collectors can be installed using one of the following methods a Integration of the collector into the tiles of a pitched roof Usin...

Page 12: ...ctor is fixed at an inclination of 30 and ballast or fixings must be used to secure the frame in the required position Refer to Fig 9 for details of location of the drain back unit in relation to the...

Page 13: ...3 023223 b Twin collectors portrait or landscape Part No 3 023241 8 Solar collect On Slates kits a Single collector portrait or landscape Part No 3 023224 b Twin collectors portrait or landscape Part...

Page 14: ...the template includes the minimum clearances required and mark the positions of the fixing holes Drill the holes to suit the fixing supplied or alternative fixings suitable for the mounting surface w...

Page 15: ...the fixing supplied or alternative fixings suitable for the mounting surface wall If using only the top fixings fit two of the screws supplied with the heads about 5 mm proud so that they will locate...

Page 16: ...lastic caps are removed from all connections Note If soldering union bends ensure that the bends are not connected to the valves etc otherwise the internal seals may be damaged soldered connections ca...

Page 17: ...res to terminals 45 and 46 the polarity is not important on the terminal block Ensure that the cable is secured in the cable clamp 5 Connect the Mains Supply The solar cylinder has been fitted with a...

Page 18: ...tly installed and that all the terminal connections are tight Switch on the electrical supply and press the On Off button on the control panel see Fig 23 to start the system 6 Check for any leaks and...

Page 19: ...and S3 S3 is always the upper temperature on the display Button Description Description Function Function Symbol State Decription DBU pump Cylinder pump Warning Sun Degrees celsius Digits Temperature...

Page 20: ...ler hot water thermostat to be left at the maximum position No 9 and that it is the purpose of the label Fig 18 to maintain this and that the label must not be removed 5 Weekly cleaning of shower head...

Page 21: ...cylinder sensor and the solar cylinder temperature is less than 65 C the drain back unit pump will start to circulate water around the collector At the same time that the drain back unit pump starts...

Page 22: ...ended that it is inspected and checked by a competent person as necessary at regular intervals Warning Before removing any covers or working on the system isolate the electrical supply The data badge...

Page 23: ...scribed in Section 8 2 Disconnect the union from the bottom of the expansion vessel and remove the locknut see Fig 27 then carefully lift the vessel out Reassemble in reverse order with a new vessel a...

Page 24: ...taken when carrying out repairs to the DBU as it reaches very high temperatures and can emit steam from connections when being removed Isolate the mains electric supply and remove the front case of th...

Page 25: ...plug housing with another spanner to prevent damaging the pipe Expect about 8 litres Loosen the flow and return connections beneath the drain back unit and slacken the locknuts Disconnect the flow an...

Page 26: ...ctor has the correct fall and length Check the collector sensor and the lower cylinder sensor do they operate check sensor resistance in Section 10 3 Check the collector tubes are they blocked with di...

Page 27: ...INDER SENSOR TEMPERATURE and RESISTANCE DATA Temperature C 0 20 50 80 105 130 160 Resistance Ohm 20 Ohm 1000 1100 1200 1300 1400 1500 1600 Collector Sensor Resistance Table Temperature C 25 30 65 85 R...

Page 28: ...sembly Ref Description Qty Part No Solar Cylinder Assembly Note Washers and seals are not supplied with the replacement components and the relevant seals kit should also be used Ref Description Qty Pa...

Page 29: ...washers Complete seals kit all DBU seals washers Wall fixing pack plugs screws Collector sensor Collector sensor extension lead 1 2 3 4 5 6 7 8 1 1 1 2 1 1 1 2 1 1 1 1 1 1 026759 1 033644 1 033420 1 0...

Page 30: ...luid details What type make of heat transfer fluid used System volume litres What is the fluid mix Water Glycol Frost protection provided to C Is the installation in a hard water area above 200ppm Yes...

Page 31: ...mpleted YES NO Engineer Name Company Name Telephone Number Comments Signature Date Energy Efficiency Checklist completed YES NO Engineer Name Company Name Telephone Number Comments Signature Date Date...

Page 32: ...ed Kingdom What this warranty does not cover Free of charge repairs to appliances that have not been installed by a qualified and competent person Repairs to appliances that have not been installed an...

Page 33: ...ly failure the system will not operate When the supply is restored the system will return to normal operation If the mains water supply fails there will be no hot water from the taps 3 Pressure Relief...

Page 34: ...starts the cylinder pump will start at 16 full speed to circulate the cylinder water through the drain back unit heat exchanger The drain back unit pump will stop when the temperature difference betwe...

Page 35: ...isplay panel and push button controls The display indicates the working modes of the system with symbols to indicate the working components of the complete system 2 USER CONTROLS Fig 1 S1 S 2 3S S1 S...

Page 36: ...ully prepared but we reserve the right to alter the specification at any time in the interest of product improvement Alpha Therm Limited 2014 Part No 1 032744 ST15 000233 0314 D337 Alpha Therm Limited...

Reviews: