Opened switch box:
1 Controller board connections
2 Power and control cable connections
Feed the load and control cables as well as the
cables for sensors into the inside of the unit
through the openings provided at the rear of the
unit.
For positioning of the rubber grommets for
feeding through the cables, see “dimensioned
drawing” for the respective model
Lay load and control leads in the cable duct inside
the unit all the way to the switchbox.
Install electrical connections according to the ter-
minal diagram and the circuit diagrams.
“Terminal diagrams” and “Circuit diagrams” for
the respective model
IMPORTANT
Install electric connections only according to
the terminal diagram and the circuit diagrams
that apply to your model.
IMPORTANT
Ensure clockwise rotary field of the load
power supply (compressor).
Operation with the incorrect rotary direction
of the compressor can cause serious, irrepa-
rable damage to the compressor.
IMPORTANT
The power supply for the heat pump must
be equipped with a three-phase automatic
circuit-breaker with at least 3mm contact
spacing to IEC 60947-2.
Note the level of the tripping current.
“Technical data / Scope of delivery” overview,
“Electrics” section
E
D
C
B
www.alpha-innotec.de
D - 95359 Kasendorf
Industriestraße 3
Alpha-InnoTec GmbH
1
1
Ers. d.
Ers. f.
Benennung
Durchflusssensor VFS5-100
603772
-
Zust.
Änderungstext
Datum
9.2.2009
HS
Von
Blatt
von
Werkstoff
Gewicht
-
Maßstab
1:2
Det. Maßstab
Datum
Name
Erstellt
Gepr.
Norm.
9.2.2009
Stenglein
toleranz
Allgemein-
DIN ISO 2768 -c
Oberflächen
ArtikelNr.
---
1
2
3
4
Schutzvermerk nach DIN 34 beachten
Blattformat: A4 hoch
IMPORTANT
The sensor cable for heat quantity recording
may not be shortened!
NOTE
The control panel of the heating and heat
pump controller can be connected to a com-
puter or network using a suitable network
cable, enabling the heating and heat pump
controller to be controlled remotely from
there.
If this is required, install a shielded network
cable (category 6, with RJ-45 connector)
through the unit when installing the connec-
tions and run it through the front panel of the
unit, parallel to the existing control cable of
the heating and heat pump controller.
After completing all electrical installation work,
close the switchbox inside the unit.
Screw on the front panel of the unit, if no further
installation work inside the unit is to be carried out
immediately.