zz
___________________________________________________________________
Alpha ESS Co., Ltd.
Page 29 of 75
Your Smart Energy
left and the right battery is a recommended distance. Keep the distance as short
as you can if there is no influence to the operation.
2)
For battery stack, lock the screw M6*6 on top of the first battery pack.
3)
Place the battery positioning paper plate against the wall and the bottom with
notch against the first battery pack. Repeat steps 1-7.
4)
The bottom limit holes of the second battery will match the top screws of the
first battery.