zz
___________________________________________________________________
Alpha ESS Co., Ltd.
Page 39 of 75
Your Smart Energy
3.
Dismantle the AC cable by 80mm, and strip the insulation of L, N and PE conductors
by 10mm.
4.
Insert the stripped part of the conductors into the cord end terminals and crimp
them using a crimping tool.
5.
Insert the terminals with different color conductors to the holes of the respective
polarity and tighten them one by one using the torque of 2 Nm with tool of cross
recessed screwdriver.
6.
Fix the AC connection cover tightly on the inverter and tighten the pressure caps
of the two cable glands.
Installation method of AC cable via
cable gland. If the outer diameter of
the cable is thicker, remove the inner
sealing ring from the cable gland.