
Allied Construction Products, LLC www.alliedcp.com
TM576981_HP700B_18feb
8
7.0 Install / Uninstall Ho-Pac
7.1 Attach the Ho-Pac to Carrier
The Ho-Pac is attached to the carrier in the same
manner as mounting a bucket. Use standard
mechanic’s techniques and tools. The described
installation is for a typical pin on type. Procedures
may vary and you should always follow the
instructions in the manual that is provided by the
carrier manufacturer.
For carriers equipped with a quick coupler, refer to
the owner’s manual furnished by the coupler
manufacturer for instructions.
7.1.2 Tools Required to Mount Ho-Pac On Carrier
No special tools are required, but the following tools
should be available:
x
PPE including Safety eyewear & gloves
x
Sledge Hammer
x
Drift pin / Alignment bar
x
3/4 drive socket wrench
x
3/4 drive metric sockets
x
Grease gun
x
Standard & Metric open end wrenches
x
Rags
x
Suitable container to collect fluids
CAUTION
Personal protection equipment required
when handling. PPE should include
appropriate clothing, gloves, safety
eyewear and shoes.
CAUTION
Some procedures, such as attaching the Ho-Pac to
and from the carrier, will require an assistant. Both
the operator and assistant must be qualified in these
procedures. All directions and signals must be
agreed upon in advance.
CAUTION
Crush injury. Keep hands, feet and other
body parts clear of crush points. Use
sufficient blocking and restraints to avoid
accidental or sudden movement of loads.
With the bucket removed, install the Ho-Pac to the
carrier in same manner as mounting a bucket.
Installation procedures can vary. Mounting bracket,
hardware, pins and adapters may be furnished with
the Ho-Pac or supplied in the mounting kit.
The following describes basic procedures used to
mount a Ho-Pac to a machine equipped with a typical
pin on type mounting arrangement.
The machine operator and an assistant shall perform
the following procedure:
1.
Operator: Move carrier and Ho-Pac to a firm level
surface. Position the Ho-Pac with the hose side
toward the carrier.
2.
Assistant: Check that the Ho-Pac is stable and all
loads are supported.
3.
Operator: Maneuver the stick in between lugging
of the mounting bracket. Align the stick pin holes
to the mounting bracket holes.
4.
Assistant: Clean pins of rust and debris before
they are installed. Insert the stick pin and secure
with keepers.
5.
Repeat procedure for installing link pin.
6.
Lubricate pins.
7.2 Connect Pressure and Return Lines
IMPORTANT
Contamination can diminish service life. Prevent
contaminating the oil. Always clean the area around
connections prior to opening the hydraulic system.
IMPORTANT
Exercise extreme care to ensure fluids are collected
in a suitable container when opening the hydraulic
system. Clean up spilled fluids and obey all local
regulations for the disposal of these fluids.
1.
Connect Supply [IN] and Return [OUT] hoses to
carrier’s hydraulic circuit.
CAUTION
Hydraulic circuits differ between
machines. Improper set up can
damage the Ho-Pac or carrier. Only
qualified personnel, having knowledge
of the machine’s systems should
install.
Identify whether the carrier's pressure line is located
on the right-hand or left-hand side. Do not guess. The
Ho-Pac will not operate if these hoses are crossed.