IE048-480 Power Supply Installation Guide
49
Visually inspect the bracket to verify that the DIN rail is now fitted into the
top and bottom bracket slots.
Note
Allied Telesis recommends installing DIN rail end clamps to the
sides of the device to prevent damage or network traffic loss from
vibration or shock. End clamps are not available from Allied Telesis.
Summary of Contents for IE048-480
Page 1: ...613 002833 Rev A IE048 480 Industrial AC DC Power Supply Installation Guide...
Page 6: ...6 I PDF Allied Telesis alliedtelesis com library...
Page 8: ...Contents 8...
Page 10: ...Figures 10...
Page 12: ...Tables 12...
Page 16: ...Preface 16...
Page 42: ...Chapter 2 Beginning the Installation 42...
Page 51: ...IE048 480 Power Supply Installation Guide 51 Figure 12 Installing the Ground Wire...
Page 53: ...IE048 480 Power Supply Installation Guide 53 Figure 13 Installing the AC Power Wires...