
9
Figure 1: Front Panel of the GS950/10PS V2 Switch ........................................................................................................... 18
Figure 2: Front Panel of the GS950/18PS V2 Switch ........................................................................................................... 18
Figure 3: Front Panel of the GS950/28PS V2 Switch ........................................................................................................... 19
Figure 4: Front Panel of the GS950/52PS V2 Switch ........................................................................................................... 19
Figure 5: Back Panel of the GS950/10PS V2 Switch ........................................................................................................... 19
Figure 6: Back Panel of the GS950/18PS V2 and GS950/28PS V2 Switches ..................................................................... 20
Figure 7: Back Panel of the GS950/52PS V2 Switch ........................................................................................................... 20
Figure 8: PoE MAX LED ....................................................................................................................................................... 30
Figure 9: POWER LED ......................................................................................................................................................... 31
Figure 10: Link/Activity and PoE LEDS for the Copper Ports on the GS950/28PS V2 Switch ............................................. 32
Figure 11: Link/Activity and PoE LEDS for Copper Ports 1 to 24 on the GS950/52PS V2 Switch ....................................... 32
Figure 12: Link/Activity LEDS for Copper Ports 25 to 48 on the GS950/52PS V2 Switch.................................................... 33
Figure 13: LEDs for the SFP Ports on the GS950/28PS V2 Switch ..................................................................................... 34
Figure 14: LEDs for the SFP Ports on the GS950/52PS V2 Switch ..................................................................................... 35
Figure 15: eco-Friendly Button ............................................................................................................................................. 36
Figure 16: Airflow.................................................................................................................................................................. 38
Figure 17: Installation Options .............................................................................................................................................. 45
Figure 18: Package Contents ............................................................................................................................................... 47
Figure 19: Equipment Rack/Wall Brackets ........................................................................................................................... 48
Figure 20: Affixing the Bumper Feet ..................................................................................................................................... 50
Figure 21: Switch Orientations in an Equipment Rack ......................................................................................................... 52
Figure 22: Attaching the Equipment Rack Brackets ............................................................................................................. 54
Figure 23: Installing the Switch in an Equipment Rack......................................................................................................... 54
Figure 24: Wall Installations.................................................................................................................................................. 56
Figure 25: Unsupported Switch Orientations on a Wall ........................................................................................................ 57
Figure 26: Recommended Minimum Reserved Wall Area with the Front Panel Facing Up ................................................. 59
Figure 27: Recommended Minimum Reserved Wall Area with the Front Panel Facing Down.............................................60
Figure 28: Switch on a Wall with a Plywood Base................................................................................................................ 61
Figure 29: Steps to Installing the Switch with a Plywood Base ............................................................................................62
Figure 30: Installing the Brackets to the Switch for Wall Installation .................................................................................... 66
Figure 31: Attaching the Switch to the Plywood Base ..........................................................................................................67
Figure 32: Marking the Locations of the Bracket Holes on a Concrete Wall ........................................................................ 69
Figure 33: Installing the Switch on a Concrete Wall ............................................................................................................. 70
Figure 34: BRKT-J22 Brackets Kit........................................................................................................................................ 71
Figure 35: Wall Installation of the GS950/52PS V2 Switch with BRKT-J22 Brackets .......................................................... 71
Figure 36: Marking the Screw Holes for the BRKT-J22 Brackets......................................................................................... 72
Figure 37: Attaching the Bottom BRKT-J22 Brackets to the Wall......................................................................................... 73
Figure 38: Sliding the Switch into the Bottom BRKT-J22 Brackets ...................................................................................... 73
Figure 39: Attaching the Top BRKT-J22 Brackets to the Wall.............................................................................................. 74
Figure 40: Installing an SFP Transceiver.............................................................................................................................. 79
Figure 41: Removing the Dust Cover from an SFP Transceiver .......................................................................................... 79
Figure 42: Positioning the SFP Handle in the Upright Position ............................................................................................80
Figure 43: Connecting a Fiber Optic Cable to an SFP Transceiver...................................................................................... 80
Figure 44: Installing the Retaining Clip ................................................................................................................................. 82
Figure 45: Raising the Retaining Clip ................................................................................................................................... 83
Figure 46: Plugging in the AC Power Cord........................................................................................................................... 83
Figure 47: Lowering the Retaining Clip................................................................................................................................. 84
Figure 48: Connecting the Power Cord to an AC Power Source.......................................................................................... 84
Figure 49: Login Window ...................................................................................................................................................... 86
Figures
Summary of Contents for GS950 PS Series
Page 6: ...6...
Page 12: ...Tables 12...
Page 16: ...Preface 16...