
GS950 PS V2 Series of Gigabit Ethernet PoE+ Switches Installation Guide
53
Installing the Switch
Please review the information and perform the procedures in Chapter 2,
“Beginning the Installation” on page 39 before installing the switch.
Caution
The chassis may be heavy and awkward to lift. Allied Telesis
recommends that you get assistance when mounting the chassis in
an equipment rack.
E28
Note
The bumper feet included with the switch should not be used when
installing the device in an equipment rack. If they are already
installed, remove them before performing the installation procedure:
Note
Airflow in the switch is from left to right, when facing the front of the
device.
To install the switch in a 19-inch equipment rack, perform the following
procedure:
1. Place the unit on a level, secure surface.
2. If you have not chosen an orientation for the switch in the equipment
rack, review “Switch Orientations in the Equipment Rack” on page 52.
3. Attach the two rack mount brackets to the sides of the switch in the
selected positions, with the eight M4x6mm screws included with the
unit. Figure 22 on page 54 shows the brackets positioned so that the
front panel is even with the front of the equipment rack.
Summary of Contents for GS950 PS Series
Page 6: ...6...
Page 12: ...Tables 12...
Page 16: ...Preface 16...