3-14
SECTION 3
SERVICE
049151; 07/08
33..77
TTrraannssppoorrttiinngg TTrroow
weell
3.7 Transporting Trowel Procedures
Optional dolly jacks are available for short moves or to aid in servicing the trowel.
Install dolly jacks as follows:
1)
Inspect dolly jack for serviceability and damage.
2)
Place riding trowel on firm level ground.
3)
Tie steering levers
[I]
to frame to prevent them from tipping forward when
trowel is being lifted.
4)
Insert the front dolly jack
[J]
fully into the holes
[K]
in the mainframe of the
riding trowel. The front dolly jacks are equipped with short lifting tubes while
the rear dolly jacks have long lifting tubes.
5)
Insert the rear dolly jacks
[M]
with the long lifting tubes into the holes
[L]
provided in the rear of the mainframe. The holes in the mainframe are located
directly opposite the front holes.
6)
Turn jack handles clockwise to lift trowels and counter-clockwise to lower
trowel.
FIGURE 3.7.1
STEERING LEVER LOCATION
[I]
Summary of Contents for 048986
Page 17: ...1 1 049151 07 08 Section 1 SAFETY Section 1 SAFETY ...
Page 29: ...2 1 049151 07 08 SECTION 2 OPERATIONS Section 2 OPERATIONS ...
Page 39: ...3 1 049151 07 08 SECTION 3 SERVICE Section 3 SERVICE ...
Page 60: ...3 22 SECTION 3 SERVICE 049151 07 08 N No ot te es s ...
Page 61: ...4 1 049151 07 08 Section 4 PARTS Section 4 PARTS ...
Page 123: ...049151 07 08 INTENTIONALLY BLANK ...
Page 124: ...049151 07 08 YOUR TOTAL SOURCE FOR CONCRETE EQUIPMENT ...