![Allen-Bradley CENTERLINE Instruction Manual Download Page 82](http://html1.mh-extra.com/html/allen-bradley/centerline/centerline_instruction-manual_2900172082.webp)
Publication 2100-IN012B-EN-P - April 2005
12-2
Parts Illustrations
Typical Construction of a Unit with a Vertical Operating Handle
Unit Stab Assembly
Unit Handle Interlock
Circuit Breaker or Fusible
Disconnect (shown)
Disconnect Handle
Unit Identification Nameplate
Diagram Pocket
Captive Latch
Starter or Contactor
Control Circuit
Fuses and
Fuse Block
Auxiliary
Contacts
Control Transformer
Fusing and Fuse Block
Control Circuit
Transformer (not shown)
Power and Control
Terminal Blocks
Short Circuit Rating Label
UL Label
Captive Latch
Control Station
Pilot Devices
Reset Button
Unit Support Pan
Plastic Retaining Pin
Overload
Handle Cutout
Unit Door
Defeater Mechanism
Bulletin 2112, Size 1, FVNR
with transformer shown
Unit Nameplate
Summary of Contents for CENTERLINE
Page 1: ...CENTERLINE Low Voltage Motor Control Centers Instruction Manual ...
Page 6: ...Publication 2100 IN012B EN P April 2005 iv ...
Page 8: ...Publication 2100 IN012B EN P April 2005 vi ...
Page 30: ...Publication 2100 IN012B EN P April 2005 2 10 Installation Procedures ...
Page 42: ...Publication 2100 IN012B EN P April 2005 3 12 Final Checklist Before Energizing ...
Page 48: ...Publication 2100 IN012B EN P April 2005 4 6 Installing Conduit and Cable ...
Page 56: ...Publication 2100 IN012B EN P April 2005 5 8 Installing and Removing Plug In Units ...
Page 68: ...Publication 2100 IN012B EN P April 2005 7 10 Operator Handle and Unit Interlock ...
Page 76: ...Publication 2100 IN012B EN P April 2005 9 6 Maintenance ...
Page 78: ...Publication 2100 IN012B EN P April 2005 10 2 Maintenance After Fault Condition ...
Page 80: ...Publication 2100 IN012B EN P April 2005 11 2 Renewal Parts ...
Page 85: ...Publication 2100 IN012B EN P April 2005 Parts Illustrations 12 5 Notes ...
Page 86: ...Publication 2100 IN012B EN P April 2005 12 6 Parts Illustrations Notes ...