Publication 2100-IN012B-EN-P - April 2005
4-2
Installing Conduit and Cable
3.
To guard against dust or dirt from entering the top horizontal wireway,
replace the top plate and lifting angle bolts.
4.
Make sure that all incoming conduit is clear of the horizontal ground
bus.
5.
For approximate location of the horizontal ground bus mounted in the
top horizontal wireway, refer to publication 2100–4.2,
Mains and Incoming
Lines Dimension Reference
.
6.
For space availability for incoming cables, refer to the elevation drawings
shipped with assembled MCCs.
Installing Cable
Install cable when the temperature is above freezing (32°F or 0°C); unless
cable is suitable for installation at temperatures below freezing. This will help
prevent cable insulation from cracking or splitting.
Motor control centers are rated for use with 167°F (75°C) cable. Cable must
be sized using 167°F (75°C) column in NEC Table 310–16 (NEC 2005
Edition). The temperature rating of the lugs is not relevant.
Lugs
Verify the compatibility of wire size, type and stranding versus the power lugs
furnished. Use correct lugs in all applications. Crimp compression lugs with
manufacturer recommended tools.
NOTE:
Use the motor control center electrical schematics to verify field
wiring connection points.
Incoming Line Compartment
Top or bottom entry to the incoming line section bus is straight through to the
connection terminals. The vertical bus provides pads for the incoming lugs.
The lug selection should be based on the size, number and type of conductor.
ATTENTION
Properly connect all line and load cables to avoid a bolted
fault and equipment damage.
Summary of Contents for CENTERLINE
Page 1: ...CENTERLINE Low Voltage Motor Control Centers Instruction Manual ...
Page 6: ...Publication 2100 IN012B EN P April 2005 iv ...
Page 8: ...Publication 2100 IN012B EN P April 2005 vi ...
Page 30: ...Publication 2100 IN012B EN P April 2005 2 10 Installation Procedures ...
Page 42: ...Publication 2100 IN012B EN P April 2005 3 12 Final Checklist Before Energizing ...
Page 48: ...Publication 2100 IN012B EN P April 2005 4 6 Installing Conduit and Cable ...
Page 56: ...Publication 2100 IN012B EN P April 2005 5 8 Installing and Removing Plug In Units ...
Page 68: ...Publication 2100 IN012B EN P April 2005 7 10 Operator Handle and Unit Interlock ...
Page 76: ...Publication 2100 IN012B EN P April 2005 9 6 Maintenance ...
Page 78: ...Publication 2100 IN012B EN P April 2005 10 2 Maintenance After Fault Condition ...
Page 80: ...Publication 2100 IN012B EN P April 2005 11 2 Renewal Parts ...
Page 85: ...Publication 2100 IN012B EN P April 2005 Parts Illustrations 12 5 Notes ...
Page 86: ...Publication 2100 IN012B EN P April 2005 12 6 Parts Illustrations Notes ...