In Figure 4.1, glass fiber reinforced tape or glass filament tape is used. The
taping should be continuous from the point the cables enter the MCC to the
point the cables are terminated. It is important that cables are wrapped several
times for additional strength. Cable slack should be drawn up during wrapping
so that individual cables are supported by the tape as a single mass.
Figure 4.1 Securing Cables with Glass Tape
In Figure 4.2, cables are lashed in a “figure 8”-type configuration using nylon
rope. The rope lashing should be continuous from the point the cables enter
the MCC to the point the cables are terminated. Other types of rope lashing
may be acceptable. Cable slack should be drawn up during wrapping so that
individual cables are supported by the rope as a single mass.
Figure 4.2 Securing Cables with Nylon Rope
Summary of Contents for CENTERLINE
Page 1: ...CENTERLINE Low Voltage Motor Control Centers Instruction Manual ...
Page 6: ...Publication 2100 IN012B EN P April 2005 iv ...
Page 8: ...Publication 2100 IN012B EN P April 2005 vi ...
Page 30: ...Publication 2100 IN012B EN P April 2005 2 10 Installation Procedures ...
Page 42: ...Publication 2100 IN012B EN P April 2005 3 12 Final Checklist Before Energizing ...
Page 48: ...Publication 2100 IN012B EN P April 2005 4 6 Installing Conduit and Cable ...
Page 56: ...Publication 2100 IN012B EN P April 2005 5 8 Installing and Removing Plug In Units ...
Page 68: ...Publication 2100 IN012B EN P April 2005 7 10 Operator Handle and Unit Interlock ...
Page 76: ...Publication 2100 IN012B EN P April 2005 9 6 Maintenance ...
Page 78: ...Publication 2100 IN012B EN P April 2005 10 2 Maintenance After Fault Condition ...
Page 80: ...Publication 2100 IN012B EN P April 2005 11 2 Renewal Parts ...
Page 85: ...Publication 2100 IN012B EN P April 2005 Parts Illustrations 12 5 Notes ...
Page 86: ...Publication 2100 IN012B EN P April 2005 12 6 Parts Illustrations Notes ...