
18
Rockwell Automation Publication 1608S-UM001C-EN-P - November 2018
Chapter 3
Installation
Communication
Connections
1.
Remove the left-side cover (two Phillips screws at the top and bottom).
2.
Conduit entry available from top or bottom.
3.
Install the appropriate communication cable.
(See
Configure Communication Settings on page 9
):
8P8C (RJ45) modular Ethernet cable. Pass the Ethernet cable
through the included RF filter core, and close the core securely,
as shown in
Figure 2
. Failure to install the cable filter may result
in RF emissions beyond the standards of the European Union's
electromagnetic compatibility (EMC) directive.
Figure 2 - Ethernet cable filter installation. The clip-on filter core is supplied with the monitor.
Final Check
Follow these steps to make final communication checks.
1.
Check all connections.
2.
Replace left and right-side covers.
External Power Supply
The external 9V DC power supply (not provided) is used only during
configuration; it should not be used in normal operation. Remove the
left-side cover to access the 9V DC jack.
Initial Battery Charge Time
The rechargeable batteries may become discharged after some time on the shelf.
Allow 30 minutes charge time after power-up before the monitor is ready to
record voltage interruption events.