![All Swim CITYPOOL Installation And Maintenance Manual Download Page 18](http://html1.mh-extra.com/html/all-swim/citypool/citypool_installation-and-maintenance-manual_2897847018.webp)
18
Fig. 18 Pool filling with rubble
7.2 Corners filling
Filling starts with 4 corners consolidation.
Gently pour the rubble to the corners in the diagonal
contraposition (not moving the pool from the base) by filling
1/3 of the height.
In order to preserve the stability of the structure, it is
recommended to use of light machinery for filling process
(mini loader type).
Check level and readjust swimming pool leveling.
To lower an angle, do not tap your or jump on the
lip of the pool. Raise the pool, fix the base, and
put it back in again.
Raise the pool, fix the base, and lower the pool
again.
To raise the corner, use wooden rafters as a lever
to lower the rubble. (
Fig. 19
)
Fig. 19 Pool raising with lever
Summary of Contents for CITYPOOL
Page 1: ...CITY POOL Installation and Maintenance Guide...
Page 17: ...17 Fig 16 Pool fixing with supports and straps Fig 17 Pool filling with rubble...
Page 22: ...22 CONNECTION OF TECHNOLOGICAL POOL EQUIPMENT 11 Pool equipment 11 1 BASIC modification...
Page 23: ...23 Fig 26 City Pool Basic schematic diagram...
Page 25: ...25 11 2 ACTIVE modification...
Page 26: ...26 Fig 27 City Pool Active schematic diagram...
Page 28: ...28 11 3 FUN modification...
Page 42: ......
Page 43: ...43...