![All Swim CITYPOOL Installation And Maintenance Manual Download Page 15](http://html1.mh-extra.com/html/all-swim/citypool/citypool_installation-and-maintenance-manual_2897847015.webp)
15
Fig. 14c The second phase of earthworks . Pool positioning
Main drain connection:
1.If it is possible to drain water from
the pool, connect a pipe to the drain
outlet and do do it before loading the
pool into the pit.
2.
If not possible, glue the plug.
3. Also, you can connect to the water
filling inlet in it, and then filling the
pool and the addition will be easy for
you to adjust with the valve installed
in a convenient location.
Skimmer overflow outlet connection:
1. The skimmer is equipped with a high water level drain
outlet.
2. On the back of the pool (next to the skimmer) you
will find a PVC pipe d25 left for connection
3. Connect the pipe to drainage rainwater or, if not
feasible, lower the pipe down to the drainage crush
layer around the pool.
Summary of Contents for CITYPOOL
Page 1: ...CITY POOL Installation and Maintenance Guide...
Page 17: ...17 Fig 16 Pool fixing with supports and straps Fig 17 Pool filling with rubble...
Page 22: ...22 CONNECTION OF TECHNOLOGICAL POOL EQUIPMENT 11 Pool equipment 11 1 BASIC modification...
Page 23: ...23 Fig 26 City Pool Basic schematic diagram...
Page 25: ...25 11 2 ACTIVE modification...
Page 26: ...26 Fig 27 City Pool Active schematic diagram...
Page 28: ...28 11 3 FUN modification...
Page 42: ......
Page 43: ...43...