8 of 19
5. Raise the lift to a comfortable working height. Check the clearance and movement of the
Jackbeam by sliding the Jackbeam forward and backward on the rails. Check that the rollers
are centered on the rails at all points along the rail's length. Adjustment of the base arms may
be necessary to assure proper operation.
6. Tighten the bolts and nuts to retain the roller adapters. See
Figure 6
.
7. Bolt the mounting bracket to the location on the base frames of Jackbeams that are closer to
the connection terminal on the DS runway, using the supplied hardware in the accessory kit.
Mount the terminal fitting onto the bracket. See
Figure 2 & 4
.
8. Remove the thread protector from the air inlet of the pump, and install the 1/4" NPT 90° elbow
from accessory kit on to the air/hydraulic pump. Then route the polytube underneath Jackbeam
from the elbow to the terminal on bracket. See
Figure 5
.
9. Remove 1/4" plugs from terminal at front and rear lift
.
Attach one end of the recoil hose to the
terminal on Jackbeam base frame, than attach the other end of the recoil hose to the terminal
fitting on the side of the lift runway. See
Figure 6
.
Figure 4-Bracket and Terminal
Figure 5-Air Hose Routing
Figure 6-Recoil Hose Connection (Front)