12
INSTALLATION
2
WARNING
The equipment described in this manual is designed to operate with LP-gas, a
flammable fuel under pressure. The nature of the application involves inherent
hazards that could result in injury. Only a TRAINED and FULLY QUALIFIED person
should service this equipment.
NOTE
Prior to installing your new ZIMMER, check all relevant codes and standards that
apply in your local area to ensure compliance!
CAUTION
To prevent ignition of hazardous atmospheres:
1. Any repairs internal to the flameproof enclosure must be made by the
manufacturer or its authorized service center.
2. Keep flameproof enclosure tight, torque to 40,6 Nm (30 ft. lbs.) while in service
and disconnect power before installing or removing vaporizer from service.
NOTE
Installer must install a terminal box (connection facility).
Metal Terminal Box (3/4”):
Use a suitably certified metal terminal box (3/4”) for the area classification,
ATEX or IECEx certified - for Europe; or Class I, Division 1, Group D (UL listed
or equivalent) - for US and Canada. Electrical wiring must be rated for -20ºC
(-4ºF) to 130
°
C (266
°
F).
CAUTION
Vaporizer may be hot during or after use.
CAUTION
To provide grounding, connect only metal electrical conduit or armored cable to the Metal
Terminal Box.
CAUTION
Do not install vaporizer in corrosive environments or expose to corrosive chemicals.
CAUTION
If flameproof joint dimensions are required by the end user, please contact Algas-
SDI.
CAUTION
Propane odor can fade.
Summary of Contents for ZIMMER
Page 2: ......
Page 20: ...19 Wire Length Chart 4 AWG 21 1 mm2 Wire Length Chart 6 AWG 13 3 mm2...
Page 21: ...20 Wire Length Chart 8 AWG 8 36 mm2 Wire Length Chart 10 AWG 5 26 mm2...
Page 45: ......
Page 46: ......
Page 47: ...32...