3.
Operation
Direct Fired Vaporizer start up procedure
11
Figure 6– Temperature control dial in “RUN” position
11
Figure 7 – Pilot button pressed down and ignitor switch on
12
Direct Fired Vaporizer setpoint adjustment
12
Figure 8 – Rotating temperature control dial counter-clockwise to desired setpoint
12
Direct Fired Vaporizer shutdown procedure
13
Figure 9 – Vaporizer shut down procedure
13
Direct fired vaporizer purge procedure
14
Automatic Re-Ignition Operation
14
Economy Operation
14
4.
Maintenance
Service and Maintenance
15
Table 3 – Initial Installation & Operation InspectionsError! Reference source not found.
15
Table 4 – Annual Maintenance RequirementsError! Reference source not found.
16
Direct fired vaporizer maintenance checklist
18
Replacing Reignitor Battery
19
Figure 10 – Opening the battery access door
19
Figure 11 – Replacing the battery
20
Adjusting the Regulator
21
Figure 12 – Regulator adjustment
21
Liquid inlet valve maintenance
22
Capacity control valve maintenance
23
5.
Troubleshooting
Pilot
25
Main Burner Will Not Ignite
25
If Vapor Pressure Drops
25
Troubleshooting Tree #1: Pilot Will Not Light
26
Troubleshooting Tree #2: Pilot Lights But Will Not Hold
27
Troubleshooting Tree #3: Main Burner Will Not Light
28
Troubleshooting Tree #4: Vapor Service Pressure Drops
29
Appendix A: Technical Information
Table 6 – Repair Kits and Other Available Replacement Parts 160H
Liquid inlet valve pin gasket installation procedure
Thermowell leak test procedure
Summary of Contents for Direct Fired F6-ASME
Page 4: ...This page left intentionally blank...
Page 7: ......
Page 10: ...This page left intentionally blank...
Page 42: ...APPENDIX A TECHNICAL INFORMATION...
Page 43: ...Appendix A This page intentionally left blank...
Page 50: ...Appendix A...
Page 51: ...Appendix A...