Operation
Algas-SDI Operation and Maintenance Manual – P/N – 54000
13
Direct Fired Vaporizer shut down procedure
1. Turn temperature control dial to “OFF” position. Pilot flame should
immediately extinguish.
2. Once the pilot flame has extinguished turn the ignitor switch to “OFF.
3. Close the isolation valve ahead of the burner regulator on the side of the
vaporizer. This will prevent any fuel from going downstream to the
thermostat, pilot and main burner.
Figure 9
–
Vaporizer shut down procedure
Isolation valve
Thermostat
Regulator
Summary of Contents for Direct Fired F6-ASME
Page 4: ...This page left intentionally blank...
Page 7: ......
Page 10: ...This page left intentionally blank...
Page 42: ...APPENDIX A TECHNICAL INFORMATION...
Page 43: ...Appendix A This page intentionally left blank...
Page 50: ...Appendix A...
Page 51: ...Appendix A...