The Eve Single charging station has the following Smart 
Charge options:

1.  Active load balancing: this offers the same functionality 

for managing charging speeds as the default load balan-
cing in double charging stations. Managing the maximum 
charging current now, however, is a dynamic process. 
The charging station communicates with the smart 
meter in your installation or home and takes the current 
usage and maximal capacity of your grid connection into 
account.

2.

  Smart Charging Network (SCN): When activated, Alfen 

charging stations will recognise each other within a 
local network, a so-called charging plaza. In that case, 
the local grid settings are shared between the charging 
stations. Together, the charging stations decide how 
much power each outlet - provided a vehicle is connec-
ted - will be allocated. To simplify the order process of 
smart charge functionalities, a number of parameters 
have been provided with default settings. This appendix 
provides the values of these settings. If your installation 
needs different settings from these defaults, use the 
Service Installer to configure the charging station for 
your specific situation.

B.1. Active load balancing 

Requirements for the installation:

• 

Alfen charging points with activated Active Load 

 

balancing functionality.

• 

Communication cable with 4-veined RJ11/RJ12 

 

connectors.

• 

Smart meter supporting one of the following 

 

protocols:   
-  DSMR or eSMR over a P1 port

. See 

datasheets

 

  for the supported versions of this protocol.

  -  Modbus TCP/IP: the charging station will assume the  
  role of the Modbus Master in this configuration. 

 

  The smart meter is the Slave.

 

NOTICE!

Alfen recommends a maximum cable length of 20 metres, 
combined with the P1 port. Always check if the communi-
cation with the smart meter is working properly. The quality 
of the signals depend on several factors. Therefore, always 
limit the cable length to prevent risks concerning the signal. 
Alfen ICU B.V. is not liable for continuous and correct ope-
ration of the connection to the P1 meter and the quality of 
the transferred signals.

The charging station and the smart meter communicate 
via the P1 port. For this, the DSMR protocol is used (for 
supported versions, see datasheets on alfen.com

). 

Periodi-

cally, information on current usage is exchanged. When the 
meter capacity is reached, the charging station will adjust 
the connected vehicle. This prevents the installation from 
overloading, otherwise the cost of the grid connection will 
unnecessarily go up. This functionality effectively makes 
for 'peak shaving', it controls the power supply during peak 
moments.

If the P1 port of the smart meter is already occupied by 
another device, you can use a splitter. For advice on split-
ters, please contact your dealer.

 

NOTICE!

Not all splitters can be used. 2-veined connectors cannot 
be used. In that case, your charging station might not be 
able to communicate with the smart meter. Alfen is not 

 

liable for continuous and correct operation of the 

 

connection to the P1 meter if this has multiple devices 

 

and/or splitters attached.

To set up the active load balancing correctly, set the 
following parameters:

• 

Station-maxCurrent; This limits the maximum current on 
the charging station group.

• 

SmartMeter-maxCurrent; This is the capacity of your 
grid connection. When in doubt, check this with your grid 
operator.

• 

Load balancing safe current (A): the value of the current 
that remains available for the charging station (or char-
ging plaza) when the connection between the energy 
meter and the charging station is lost.

APPENDIX B: DEFAULT SELECTIONS FOR  

OPTIONAL FACTORY SETTINGS

Summary of Contents for Eve Single Pro Series

Page 1: ...Eve Single Manual Handleiding Handbuch Manuel K ytt opas S line Pro line...

Page 2: ......

Page 3: ...socket model met stopcontact Modell mit Steckdose mod le avec prise pistorasialla varustettu malli INSIDE BINNENZIJDE INNENSEITE INT RIEUR SIS PUOLI OUTSIDE BUITENZIJDE AUSSEN EXT RIEUR ULKOPUOLELLA...

Page 4: ...t model met stopcontact Modell mit Steckdose mod le avec prise pistorasialla varustettu malli Exterior view Buitenzijde Aussenansicht Ext rieur Ulkopuolella 1 1 3a 3b 2 2 11 10a 8 9 10b 11 11 10a 11 7...

Page 5: ...ilisation of all advanced features of your charging station we recommend that you read this manual carefully and save it for future reference While we have done our utmost to provide you with a comple...

Page 6: ...s 14 2 6 Accessories 15 2 7 Technical specifications for installation 16 2 7 1 External protection according to EV ZE Ready standard 16 3 Assembly and connecting 16 3 1 Safety Instructions 17 3 2 Asse...

Page 7: ...individual components are damaged Usage by children or individuals not able to properly assess the risks associated with using this product Alfen ICU B V shall not be liable in any way for any kind o...

Page 8: ...or plug holder 4 RGB Status LED Interior view Interior view 5 UTP Ethernet connector 5 UTP Ethernet connector 6 RJ11 connector 6 RJ11 connector 7 7 SIM cardholder 8 Terminal block for the power supply...

Page 9: ...Charge card accepted cable connected Communicating with vehicle or charging complete Charging transaction active Status indicators during smart EV charging load balancing The Eve Single S line will i...

Page 10: ...3 2 3 Operation Specific user actions are presented in a sequence that cearly shows the progress and corresponding status indications The first steps can be conducted in any sequence Upon detecting a...

Page 11: ...h h kW kW kWh h Models with fixed charging cable Models with socket Models with socket Models with fixed charging cable Pro line Pro line Pro line Pro line 2 4 1 3 2 4 1 3 2 4 1 3 2 4 1 3 RFID Chargin...

Page 12: ...to undo the action To close the database hold the Master Key in front of the card reader once more Hold the Master Key in front of the card reader Hold the charge pass that you want to add in front o...

Page 13: ...C detector that protects the earth leakage circuit breaker against DC leak age currents The DC detector prevents type A earth leakage circuit breakers from becoming blind to dangerous leakage currents...

Page 14: ...ts default casing colour RAL9016 Other darker colours may have an adverse effect on the product If the product is exposed to lower or higher temperatures continuous operation cannot be guaranteed If t...

Page 15: ...x Quick Installation Guide 1 x M8 nut 4 x M25 x 1 5 For model with fixed charging cable 2 x 2 PRODUCT 2 6 Accessories Item Details Article no Mounting post 803873036 ICU Pole dimensions H x W x D Bas...

Page 16: ...ase 16A 11kW 3 x 20A gG 1 phase 32A 7 4kW 1 x 35A gG 3 phase 32A 22kW 3 x 35A gG Residual current protection possibly i c w circuit breakers Earth leakage circuit breakers 30mA type A or B 4P 3 7kW 11...

Page 17: ...short circuiting and overcurrent with a B or C type circuit breaker or other in accordance with local standards and regulations or gG type fuses or other in accordance with local standards and regula...

Page 18: ...ring and the construction Spirit level Drill machine Torque driver for terminal block connections 3 5 Installation procedure prerequisites The installation location is a solid wall In the surroundings...

Page 19: ...ount the charging station on the wall mount frame Connect the earth wire on the bottom right threaded end of the wall mount frame Use the M8 washer and nut for installation 3 7 Electrical installation...

Page 20: ...tion Screw the front cover back onto the charging station with the Torx T20 wrench Use all six screws for this Models with display Connect the display connector 3 10 Data cable options 3 10 1 Connecti...

Page 21: ...ionality If so check the settings with the Service Installer application to optimally configure the charging station for the local situation More information is available in Appendix B 4 3 Commissioni...

Page 22: ...the smart charge options see Appendix B check the settings and adjust them where necessary to optimally configure the charging station for its location The Service Installer application is divided in...

Page 23: ...isconnect the transpa rent subframe 3 x Torx T20 screw To install a card access the SIM cardholder from the left side This will provide you with more space Be careful not to crush any cables while rep...

Page 24: ...4460127 Eve Single Pro line DE 3PH Cable NG910 60127 904460503 Eve Single S line 1PH T2 NG910 60503 904460505 Eve Single S line 1PH T2S NG910 60505 904460507 Eve Single S line 1PH Cable NG910 60507 90...

Page 25: ...charge point supplier Check powerboard 105 Not able to charge Please call for support Internal error No communication with internal power meter Contact the service department of your charge point supp...

Page 26: ...Cable connected for more than 2 minutes without starting a charging session Reconnect cable and start charging session within 2 minutes Otherwise contact the service depart ment of your charge point...

Page 27: ...ging cable is out of range according to the IEC 61851 norm One specific cable Issues with other charge points Cable broken All cables No issue with oth er charge point Contact the service department o...

Page 28: ...20 metres combined with the P1 port Always check if the communi cation with the smart meter is working properly The quality of the signals depend on several factors Therefore always limit the cable le...

Page 29: ...e network operator Subnet mask of the local network Modbus address of the energy meter Default gateway of the local network Factory settings Options Values SCN NetworkName Name of the SCN Maximum of 8...

Page 30: ...0 1 W SIGNED32 Reactive Power L1 VAr 0 1 VAr SIGNED32 Reactive Power L2 VAr 0 1 VAr SIGNED32 Reactive Power L3 VAr 0 1 VAr SIGNED32 Apparent Power L1 VA 0 1 VA UNSIGNED32 Apparent Power L2 VA 0 1 VA...

Page 31: ...0Mbps network UDP port 36549 inbound outbound Use the DHCP server if possible Without a DHCP server the charging stations obtain an IP address via Auto IP All charging stations are fed from the same p...

Page 32: ...e SCN if you have not purchased this functionality After you receive confirmation for your purchase of this functionality by Alfen the new functionality can be downloaded using the Service Installer a...

Page 33: ...ely For this purpose all local authorities have established collection schemes under which residents can dispose waste electrical and electronic equipment at a recycling centre or other collection poi...

Page 34: ......

Page 35: ...1 0 36 54 93 401 Website www alfen com nl oplaadpunten ev www alfen com en ev charge points Contact Contact Kontakt Contact Yhteystiedot Alfen ICU B V Hefbrugweg 28 1332 AP Almere The Netherlands P O...

Reviews: