                                Figure 2: Minimum distance of the boiler from the walls

 

If the pellet boiler is installed in a boiler room with other devices that take in air (other boilers, various types of suction 

fans, etc.), make sure that the volume of air entering the room is sufficient to guarantee safe operation of the boiler. 

If the flue passes through the ceiling it must be sufficiently insulated with coating of non-flammable insulation material. 
After the pellet boiler is set in place, level it with adjustable legs (bring it to a horizontal position). 

 CAUTION 

DO NOT CONNECT the flue gas exhaust system to: 

 

a flue used by other heating appliance (boilers, furnaces, fireplaces, etc.), 

 

an air outlet system (from hoods, suction fans, etc.) 

 CAUTION 

Do not install barriers for flue gas flow regulation!

 

The Ø80 mm flue pipe connection of the pellet boiler to the flue must have the following features: 

 

total length of maximum 5 m (in case of a longer connection, the connecting pipe diameter must be Ø130 mm),  

 

each flue knee of 90˚ reduces the total flue pipe length by 1 m, 

 

each flue knee should have a cleaning cover, 

 

the flue pipe joints must be sealed. 

 CAUTION 

If the resistance in the exhaust system is too high (numerous knees, inappropriate terminations, bottlenecks, etc.), the 

flue gas outlet is not guaranteed and it is necessary to increase the connecting pipes and knees to greater dimensions, i.e. to 
Ø130 mm. Also, when the flue does not provide proper flue gas outlet, it may cause malfunctions and consequently activate 
the alarm in the Grande Lux boiler. It is recommended to have the flue inspected by a professional before installing the 
Grande Lux 37 boiler. 

The system for flue gas extraction from the boiler operated at a vacuum generated in the combustion chamber and the 

faint pressure in the Ø80 mm flue pipe. Therefore, make sure that the flue pipe is completely sealed. 

Carefully analyze the position and condition of the space through which the flue passes. If the flue pipe passes through a 

wall and/or roof it should be suitably insulated in accordance with the safety regulations for fire protection. 

Make sure that the room with installed pellet boiler has a sufficient amount of air guaranteeing proper combustion. The 

outside air supply pipe should have a minimum outer diameter of 110 mm and a maximum length of 10 m. For every 90˚ 
knee, the maximum length is reduced by 1 m. If it’s too long, increase the diameter of the air supply pipe. 

If a grate is fitted on the façade, the surface of the air supply port must be at least 100 cm

2

 or larger. 

The device operates on 220-230 V, 50 Hz voltage. Make sure that the electrical cables do not pass under the boiler, that 

they are placed away from heated surfaces and that they do not come into contact with sharp objects that may damage 
them. If the pellet boiler is under increased voltage, the durability of electrical components will be greatly reduced. 

 CAUTION 

Do note remove the plug from the socket in order to switch off the boiler until the flame in the boiler is extinguished. 

Otherwise, the boiler may be heavily damaged and the proper operation may be disturbed. 

 

3.2.

 

FLUE GAS EXHAUST 

The flue gas exhaust must be in accordance with the applicable regulations. Do not connect the flue pipe of the boiler to 

the flue with other heating appliances connected (Figure 3). The flue gas exhaust must not end in closed and/or in semi-
enclosed rooms, such as garages, narrow passageways, hallways, sub-corridors, etc. After connecting the boiler to the flue, 
an  authorized  chimneysweeper  should  check  if  there  are  any  damages  in  the  connection  and  whether  the  connection  is 
properly sealed. If the flue is not suitable, it must be executed in accordance with the foregoing requirements (item 3.1).

 

 

Figure 3 

YES 

NO 

Summary of Contents for Grande 37 Lux

Page 1: ...37 Lux Instruction for use maintenance and installation This product meets the requirements of the Ecodesign Directive in terms of efficiency and air pollution level in order to contribute to the red...

Page 2: ...by a person authorized by Alfa Plam The flame that develops in the boiler during normal combustion of wood biomass releases just the amount of carbon dioxide CO2 that would be released by natural wood...

Page 3: ...CE 10 8 IMPORTANT SAFETY INFORMATION 11 9 PELLET QUALITY IS VERY IMPORTANT 11 9 1 PELLET STORAGE 11 10 BOILER CONTROL SYSTEM 11 10 1 Electrical connection diagram 12 10 2 Touch screen control panel di...

Page 4: ...ents and or damage occurred due to use of non original or inappropriate spare parts Installations is solely within the responsibility of the installer 2 1 MAIN USER RESPONSIBILITIES The boiler user mu...

Page 5: ...ommissioning inspect the operation during at least 30 minutes in order to check whether all requirements have been met After finishing the installation the installer should provide the customer with t...

Page 6: ...the 80 mm flue pipe Therefore make sure that the flue pipe is completely sealed Carefully analyze the position and condition of the space through which the flue passes If the flue pipe passes through...

Page 7: ...ent always turned upward Figure 4 We recommend not making long horizontal sections for the flue connection If there is no other possibility the flue pipes should not have a downward slope but upward t...

Page 8: ...7 AISI 316 steel flue with double insulated chamber material resistant to 400 C Optimal efficiency 100 Waterproof flue with double insulated chamber and outer casing of light concrete Optimal efficien...

Page 9: ...ng devices such as a hoods hair dryers fans etc located in the room with the boiler combustion air fresh air must be supplied from outside In any case this should be discussed with the competent chimn...

Page 10: ...e universal ones Check if the valve is easily opened check with a finger so that it could be opened with the pump s power The non return valve is placed behind each pump If there are multiple pumps yo...

Page 11: ...nting damage due to sudden failure of a component which may seriously endanger the safety of persons and or your property Clean the firebox and the space underneath it when cleaning the ashes 6 2 SAFE...

Page 12: ...to the following safety rules Turn the pellet boiler off before beginning any procedure Make sure that the ash is cold before beginning any procedure on the boiler Vacuum the ashes deposited in the c...

Page 13: ...ONS ENSURE THE MAXIMUM OUTPUT OF THE BOILER AND THE TEMPERATURE OF THE SYSTEM Make sure that the pellet boiler and ashes are cold For complete weekly cleaning or after 200 kg of used pellets whichever...

Page 14: ...he type and quality of the pellets The manufacturer is not in any way responsible for poor performance of the boiler due to the use of poor quality pellets If sawdust or small decomposed pellets are p...

Page 15: ...isplay 1 2 Start screen display 2 2 YELLOW GREEN POWER CABLE FLUE GAS FAN TURBULATOR REDUCER PRIMARY AIR FAN LIGTER AUGER REDUCER THERMOMETER MANOMETER PENDULUM REDUCER PUMP MICRO SWITCH 1 MICRO SWITC...

Page 16: ...Auger Auger on off Pump Pump on off Valve Pendulum reducer on off V2 Room fan on off V3 Turbulator reducer on off A1 Heater igniter on off A3 Pendulum reducer on off A5 Auger reducer blocked not bloc...

Page 17: ...ition failure Er15 Power outage longer than 50 minutes Er16 Communication error RS485 Er17 Airflow regulator error Er18 No pellet Er25 Firebox cleaning motor error Er26 Turbulator cleaning motor error...

Page 18: ...es Boiler Thermostat The adjustable boiler water temperature range is from 40 C to 80 C By setting the temperature of the water in the boiler the user sets the operating condition of the boiler i e th...

Page 19: ...the steps decreases and increases the calibrated auger speed Fan Calibration menu for changing the speed of the flue gas fan The system has 15 calibration steps from 7 to 7 the factory setting is 0 Th...

Page 20: ...s is performed during the check up phase During this phase the flue gases motor is working at maximum speed while the auger and the igniter are turned off The check up phase takes a few seconds and th...

Page 21: ...ases temperature exceeds 230 C or when the boiler water temperature reaches 85 C During this phase the pellet feed stops until the flue gases temperature is below 230 C or the water temperature in the...

Page 22: ...ck error Internal clock problems Turn the appliance off and then on in the ON OFF menu Check the accuracy of the set time Insufficient internal battery capacity Check the accuracy of the chrono mode p...

Page 23: ...t and cleanliness Contact the service NOTE If the recommended solution fails to remove the direct cause of the alarm CONTACT ALFA PLAM CALL CENTER or the closest authorized service 11 INFORMATION ON B...

Page 24: ...8 Flue gas temperature value at reduced power C 70 Mean NOx value at 10 O2 at rated power mg m3 191 Mean CO value at 10 O2 at rated power mg m3 26 Mean dust emission value at 10 O2 at rated power mg m...

Page 25: ...d floor heating Note If only floor heating is connected to the boiler make sure to install an accumulation tank BUFFER Legend 1 Pellet boiler 2 Air vent 3 Safety valve 3 bar 4 Three way mixing valve w...

Page 26: ...draulic installation diagram accumulation tank Legend 1 Pellet boiler 2 Air vent 3 Safety valve 3 bar 4 Air vent 5 Circulation pump 6 Three way mixing valve with pipe thermostat 7 Accumulation tank BU...

Reviews: