INSTALLATION MANUAL
6
7.0 INSTALLATION OVERVIEW
To install the ALCOLOCK LR device, complete the following steps in the order
provided in this manual.
•
Inspecting the vehicle electrical system
•
Mounting the ECU, alarm horn, and (if required) alarm flasher
•
(Skip if using OBD-II) Locating the tach signal (using DTS, if applicable)
•
Connecting the ECU cable assembly, alarm horn and (if required) alarm
flasher
•
Connecting the tach wire or OBD-II assembly
•
Running the HS install procedure and ITE install transaction
•
Post-installation device testing
•
Assembling the ECU security enclosure
•
Attaching the GPS patch antenna
•
Sealing connections and restoring the vehicle
ATTENTION!
•
If any vehicle components are not functioning, it is the client’s responsibility
to have the vehicle repaired before beginning the installation
•
At end of program, the vehicle must be returned to the same condition as before
installation
•
Install the device in a vehicle location that allows the least amount of drilling or
modification
•
Use existing hardware and holes to minimize vehicle modification
•
Before beginning installation ensure that there is sufficient ventilation for
vehicle exhaust fumes. Failure to do so may cause injury
•
Before starting the engine, ensure that the vehicle is in the park or neutral
position, with parking brake engaged, to prevent the vehicle from moving
8.0 INSPECTING THE VEHICLE ELECTRICAL SYSTEM
Ensure that the vehicle electrical system is properly functioning by checking the
battery, starting and charging systems.
8.1
INSPECTING THE VEHICLE BATTERY
1. Visually inspect the battery for corrosion, cracks, holes, leakage, and other
damage.
2. Visually inspect the cleanliness of the battery case and posts.
3. Perform a battery load test on the vehicle battery and observe the battery
voltage. If the battery is detected to be fully discharged (dead), the client
must have the battery replaced elsewhere before continuing with the
installation.