Requirements

Values

Power

Integrated Power

Battery backup

Up to two 60ECv2 battery cabinets

Operating Voltage

-48 VDC

Sectors

3,sector

T1/E1 Facilities

Up to 16 T1/E1s (optional)

User Alarms

32 for external User Alarms

GPS Antenna

Yes

Product overview for 9927 Distributed Base Station
Outdoor cabinet

Product overview

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

9927 Dist BTS Outdoor
401-703-516
Issue 1

March 2012

Alcatel-Lucent – Proprietary

Use pursuant to applicable agreements

2-5

Summary of Contents for 9927

Page 1: ...and operating instructions to be furnished to the user A draft copy of the instructions may be submitted if the actual document is not available The actual document shall be furnished to the FCC when...

Page 2: ...catel Lucent 9927 Distributed Base Station Outdoor Site Preparation Guidelines 401 703 516 Issue 1 March 2012 Alcatel Lucent Proprietary Use pursuant to applicable agreements Use pursuant to applicabl...

Page 3: ...accurate at the time of printing However information is subject to change Ordering information The ordering number for this document is 401 703 516 To order this or other Alcatel Lucent information p...

Page 4: ...is issue incorporates information available as of December 2011 This is the second issue of this document Whenever this document is reissued the reasons for reissue will be provided in this section Th...

Page 5: ...ximate relationship between mm2 and AWG kcmil sizes for reference Additional wire sizes are included in this information product as appropriate for the topic ISO rated cross sectional area mm2 AWG kcm...

Page 6: ...stallation of Second 60ECv2 Battery Cabinet with First 60ECv2 Battery Cabinet 109683177 Engineering Rules for Flexent Modular Cell 4 0B ER_0102_0004 Engineering Rules for Factory and Field Installatio...

Page 7: ...ecklists helps ensure a quality installation and provides a base station site history file for later reference The punchlist sheets are used to track completion of any outstanding site preparation ite...

Page 8: ...nt Form http infodoc alcatel lucent com comments or e mail your comments to the Comments Hotline comments alcatel lucent com About this document 9927 Dist BTS Outdoor 401 703 516 Issue 1 March 2012 Al...

Page 9: ...e 9927 Distributed Base Station Outdoor Cabinet installation Contents Structure of safety statements 1 2 Safety specific hazards 1 5 Product safety 1 8 9927 Dist BTS Outdoor 401 703 516 Issue 1 March...

Page 10: ...s the source of the risk of damage or injury 5 Safety message Consequences if protective measures fail 6 Avoidance message Protective measures to take to avoid the hazard 7 Identifier The reference ID...

Page 11: ...cates a hazardous situation which if not avoided could result in minor or moderate injury NOTICE Indicates a hazardous situation not related to personal injury Within this IP the safety label typicall...

Page 12: ...type and rating Never install telecommunications wiring during a lightning storm Never install telecommunications connections in wet locations Never touch uninsulated telecommunications wiring or term...

Page 13: ...this fact and the safety warnings may lead to bodily injury and property damage For this reason only trained and qualified personnel may install or service the installation WARNING Energy Hazard The p...

Page 14: ...nking and smoking are not permitted in workplaces where BeO ceramic components are being worked on Wash your hands carefully under running water after working with BeO ceramic components If the follow...

Page 15: ...binets incorrect or improperly installed eyebolts will fail endangering personnel to bodily injury and destroying the equipment Avoid using the wrong eyebolts by following these guideline If a inch ey...

Page 16: ...uctions cautions and warnings found on these labels must be understood and observed by all personnel involved with the equipment installation and maintenance Important Refer to Structure of safety sta...

Page 17: ...se Station Outdoor Cabinet Contents Network view 2 2 Configurations 2 3 Product overview 2 4 Physical description 2 6 Components inside cabinet 2 13 Weights and dimensions of equipment 2 14 60ECv2 bat...

Page 18: ...al deployment Backhaul to the network is provided via the SAR 7705 either as Fiber optic cable Microwave cable T1 E1 line OC3 DS3 The 48 VDC power source inside the cabinet provides 48 VDC to the comp...

Page 19: ...he following configurations One MT BBU 8 Carriers 3 Sectors 4 Carriers 1x 1x Advance and 4 Carriers EVDO 3 BC1 4x40W RRH with 4 branch Rx 3 BC10 2x50W RRH with 2 branch Rx No daisy chaining One MT BBU...

Page 20: ...k is accomplished with T1 E1 lines fiber optic cable or microwave The RRHs that are used are as follows 1900 MHz 4x40W 25 MHz 1900 MHz 4x45W 65 MHz 800 MHz 2x50W The cabinet is equipped with a top sol...

Page 21: ...ctors 3 sector T1 E1 Facilities Up to 16 T1 E1s optional User Alarms 32 for external User Alarms GPS Antenna Yes Product overview for 9927 Distributed Base Station Outdoor cabinet Product overview 992...

Page 22: ...ributed BTS outdoor cabinet with the front door closed Product overview for 9927 Distributed Base Station Outdoor cabinet Physical description 2 6 Alcatel Lucent Proprietary Use pursuant to applicable...

Page 23: ...ct overview for 9927 Distributed Base Station Outdoor cabinet Physical description 9927 Dist BTS Outdoor 401 703 516 Issue 1 March 2012 Alcatel Lucent Proprietary Use pursuant to applicable agreements...

Page 24: ...nent inside the 9927 Distributed BTS cabinet Product overview for 9927 Distributed Base Station Outdoor cabinet Physical description 2 8 Alcatel Lucent Proprietary Use pursuant to applicable agreement...

Page 25: ...tion Outdoor Cabinet The dimensions are shown in mm and inches Product overview for 9927 Distributed Base Station Outdoor cabinet Physical description 9927 Dist BTS Outdoor 401 703 516 Issue 1 March 2...

Page 26: ...on Outdoor Cabinet The dimensions are shown in mm and inches Product overview for 9927 Distributed Base Station Outdoor cabinet Physical description 2 10 Alcatel Lucent Proprietary Use pursuant to app...

Page 27: ...Base Station Outdoor Cabinet features Fresh Air Cooling FAC The FAC uses filter membrane technology to achieve clean room conditions inside the baseband cabinet Product overview for 9927 Distributed B...

Page 28: ...sure lower than ambient air pressure All openings on the cabinet must be sealed to maintain negative pressure inside the baseband cabinet when the baseband cabinet is in operation Important Refer to A...

Page 29: ...705 SAR F fixed 7705 SAR M future Two 7210 SAS M 48 VDC only for microwave backhaul LTE TDD 2 6 GHz Optional or CDMA MT BBU CDMA MT BBU Growth One or two 48 VDC PDPs second unit is optional Needed onl...

Page 30: ...ne BBU One 7210 One SAR 8 Three DC DC convertors 470 kg 1033 lbs 430 kg 945 lbs 900 mm x 960 mm x 1925 mm 35 4 inches x 37 8 inches x 75 8 inches Fully loaded CDMA Four BBUs Two 7210s One SAR 8 Six DC...

Page 31: ...em Weight 12IR145 battery 45 kg 100 lbs KS24734 Rectifier 6 kg 14 lbs Pallet 40 kg 88 lbs Product overview for 9927 Distributed Base Station Outdoor cabinet Weights and dimensions of equipment 9927 Di...

Page 32: ...Distributed Base Station Outdoor Cabinet The dimensions are shown in mm and inches Product overview for 9927 Distributed Base Station Outdoor cabinet Weights and dimensions of equipment 2 16 Alcatel...

Page 33: ...or Cabinet The dimensions are shown in mm and inches Product overview for 9927 Distributed Base Station Outdoor cabinet Weights and dimensions of equipment 9927 Dist BTS Outdoor 401 703 516 Issue 1 Ma...

Page 34: ...tdoor Cabinet The dimensions are shown in mm and inches Product overview for 9927 Distributed Base Station Outdoor cabinet Weights and dimensions of equipment 2 18 Alcatel Lucent Proprietary Use pursu...

Page 35: ...60ECv2 battery cabinets can be installed to the right of the 9927 Distributed Base Station Outdoor Cabinet Hole for Padlock T op View Unlock Lock 4 Places Hole for Padlock T op View Unlock Lock 2 Plac...

Page 36: ...rview for 9927 Distributed Base Station Outdoor cabinet 60ECv2 battery cabinet overview 2 20 Alcatel Lucent Proprietary Use pursuant to applicable agreements 9927 Dist BTS Outdoor 401 703 516 Issue 1...

Page 37: ...s Typical RRH antenna array 3 2 External views of RRHs 3 3 Detailed physical description 3 6 Functional description of RRHs 3 18 Antenna Remote Electronic Tilt RET FID 13019 36 3 19 RRH mounting confi...

Page 38: ...ays on tower The figure below shows a typical RRH antenna array on a tower Product overview for RRHs Typical RRH antenna array 3 2 Alcatel Lucent Proprietary Use pursuant to applicable agreements 9927...

Page 39: ...gure is an orthogonal view of the 1900 MHz PCS 4x40W 25 MHz RRH Dimensions are shown in mm 440 17 3 330 13 0 580 22 8 Product overview for RRHs External views of RRHs 9927 Dist BTS Outdoor 401 703 516...

Page 40: ...thogonal view of 800 MHz 2x50W RRH OEM1 The following figure is an orthogonal view of the OEM1 800 MHz 2x50W RRH Dimensions are shown in mm 637 272 282 500 385 330 800 Mhz 23 kg 50 6 lbs Product overv...

Page 41: ...gonal view of the OEM2 800 MHz 2x50W RRH Dimensions are shown in mm 330 400 255 800 Mhz 23 kg 50 6 lbs Product overview for RRHs External views of RRHs 9927 Dist BTS Outdoor 401 703 516 Issue 1 March...

Page 42: ...of 1900 MHz PCS 4x45W 65 MHz RRH p 3 10 Refer to Top view of 1900 MHz PCS 4x45W 65 MHz RRH p 3 11 Refer to Bottom view of 1900 MHz PCS 4x45W 65 MHz RRH p 3 12 OEM1 800 MHz 2x50W Refer to Front view o...

Page 43: ...following figure is a front view of the 1900 MHz PCS 4x40W 25 MHz RRH Product overview for RRHs Detailed physical description 9927 Dist BTS Outdoor 401 703 516 Issue 1 March 2012 Alcatel Lucent Propri...

Page 44: ...following figure is a top view of the 1900 MHz PCS 4x40W 25 MHz RRH Product overview for RRHs Detailed physical description 3 8 Alcatel Lucent Proprietary Use pursuant to applicable agreements 9927 Di...

Page 45: ...on the bottom of the 1900 MHz PCS 4x40W 25 MHz RRH AUX Rx2 AUX Rx1 CPRI PRI CPRI SEC ASIG ALM Tx2 MON Tx2 MON Product overview for RRHs Detailed physical description 9927 Dist BTS Outdoor 401 703 516...

Page 46: ...following figure is a front view of the 1900 MHz PCS 4x45W 65 MHz RRH Product overview for RRHs Detailed physical description 3 10 Alcatel Lucent Proprietary Use pursuant to applicable agreements 9927...

Page 47: ...following figure is a top view of the 1900 MHz PCS 4x45W 65 MHz RRH Product overview for RRHs Detailed physical description 9927 Dist BTS Outdoor 401 703 516 Issue 1 March 2012 Alcatel Lucent Propriet...

Page 48: ...figure shows the connectors on the bottom of the 1900 MHz PCS 4x45W 65 MHz RRH Product overview for RRHs Detailed physical description 3 12 Alcatel Lucent Proprietary Use pursuant to applicable agree...

Page 49: ...Hz 2x50W RRH Top view of OEM1 800 MHz 2x50W RRH The following figure is a top view of the OEM1 800 MHz 2x50W RRH Product overview for RRHs Detailed physical description 9927 Dist BTS Outdoor 401 703 5...

Page 50: ...z 2x50W RRH Front view of OEM2 800 MHz 2x50W RRH The following figure is a front view of the OEM2 800 MHz 2x50W RRH Product overview for RRHs Detailed physical description 3 14 Alcatel Lucent Propriet...

Page 51: ...nnectors on the bottom of the OEM2 800 MHz 2x50W RRH Bottom view of 1900 MHz 4x40W 65 MHz RRH Get figs from attachment AUX Rx1 AUX RX2 CPRI PRI CPRI PRI STATUS Tx1 MON Tx2 MON ALD ALM 48 V IN Product...

Page 52: ...s Left and Right for 25 MHz Bottom for 65 MHz Connect 6 AWG outdoor or 2 AWG indoor ground wire terminated with 2 hole lug to RRH AUX RX1 Antenna sharing port AUX RX2 N A CPRI PRI CPRI optical main po...

Page 53: ...nna sharing port CPRI PRI CPRI optical main port CPRI SEC CPRI optical daisy chained port STATUS ALM 2 x 8 pin circular TX1 MON TX2 MON ALD 48 V IN 48 VDC input power Product overview for RRHs Detaile...

Page 54: ...re as follows One sector consists of two 1900 MHz RRHs and one 800 MHz RRH per sector Product capabilities The product capabilities for the RRHs are as follows 1900 MHz PCS CDMA LTE Outdoor 48 VDC 800...

Page 55: ...his overcomes the shortcomings of mechanical tilt antennas where the whole antenna is physically tilted This system moves the backward lobe in upward direction and distorts the side lobe patterns AISG...

Page 56: ...0 MHz RRH is mounted directly above the 1900 MHz RRH Each RRH is equipped with a lifting handle The antenna assembly is mounted opposite the RRHs Wall mounted RRHs The following figure shows a typical...

Page 57: ...floor stand that is used with 800 MHz and 4x40W 25 MHz PCS RRHs The wall mounting bracket is shown attached Product overview for RRHs RRH mounting configurations 9927 Dist BTS Outdoor 401 703 516 Issu...

Page 58: ...Product overview for RRHs RRH mounting configurations 3 22 Alcatel Lucent Proprietary Use pursuant to applicable agreements 9927 Dist BTS Outdoor 401 703 516 Issue 1 March 2012...

Page 59: ...13 0 255 10 0 RRH 1900 MHz 25 MHz per Tx port CDMA LTE Dual Technology 4 x 40 Watts 47 104 includes 2 RRHs and mounting brackets 580 22 8 330 13 0 440 17 3 RRH 1900 MHz 65 MHz per Tx port CDMA LTE Dua...

Page 60: ...ding points on the 1900 MHz and 800 MHz RRHs are located at the bottom on the left and right sides Product overview for RRHs RRHs and related equipment 3 24 Alcatel Lucent Proprietary Use pursuant to...

Page 61: ...op of RRH on right side Ground connection at bottom of RRH left or right side may be used Surge protector Surge protector Ground bus bar Ground bus bar Ground cable 6 AWG Ground bus bar Ground bus bar...

Page 62: ...g point on the OEM2 RRH is located at the right bottom as shown in the figure below The following figures show the grounding points on the 1900 MHz RRH Product overview for RRHs RRHs and related equip...

Page 63: ...oint on the 1900 MHz 4x40W RRH is located at the right bottom as shown in the figure below The following figures shows the grounding points on the 1900 MHz 4x45W RRH Product overview for RRHs RRHs and...

Page 64: ...45W RRH are located on the bottom as shown in the figure below Product overview for RRHs RRHs and related equipment 3 28 Alcatel Lucent Proprietary Use pursuant to applicable agreements 9927 Dist BTS...

Page 65: ...and site layouts for the 9228 Distributed Base Station site Contents Line up configuration 4 2 Line up configuration 4 3 Site layout 4 4 9927 Distributed Base Station Outdoor Cabinet site layout 4 5 9...

Page 66: ...9927 Distributed Base Station Outdoor Cabinet Contents Line up configuration 4 3 Site configurations for 9927 Distributed BTS Outdoor Cabinet Line up configuration Overview 4 2 Alcatel Lucent Proprie...

Page 67: ...binet and up to two 60ECv2 battery cabinets The block diagram below shows the line up for the 9927 Distributed Base Station Outdoor Cabinet and two 60ECv2 battery cabinets 60ECv2 Battery Cabinet 60ECv...

Page 68: ...ation Outdoor Cabinet Contents 9927 Distributed Base Station Outdoor Cabinet site layout 4 5 Site configurations for 9927 Distributed BTS Outdoor Cabinet Site layout Overview 4 4 Alcatel Lucent Propri...

Page 69: ...n Outdoor Cabinet can be mounted in the following manner On a concrete pad with optional mounting bases On a rooftop may be supported by a mounting structure or raised platform provided by the custome...

Page 70: ...n JUMPER CABLE SUPPORT STRUCTURE ASSEMBLY CUSTOMER PROVIDED 1 INCH AC CONDUIT GPS SURGE PROTECTOR REAR GPS ANTENNA CABLE WITH SURGE PROTECTION 1 INCH CONDUIT FOR 48 VDC AND FIBER OPTIC CABLE TO DC DIS...

Page 71: ...e preparation requirements and footprints for 9927 Distributed Base Station outdoor cabinet 9927 Dist BTS Outdoor 401 703 516 Issue 1 March 2012 Alcatel Lucent Proprietary Use pursuant to applicable a...

Page 72: ...t 5 3 Environmental requirements 5 4 Site requirements 5 6 Mounting options 5 9 Support structure ice bridge and service access clearances 5 11 Anchoring requirements 5 12 Anchoring footprints 5 13 Si...

Page 73: ...uirements 5 6 Mounting options 5 9 Support structure ice bridge and service access clearances 5 11 Anchoring requirements 5 12 Anchoring footprints 5 13 Basic site preparation requirements and footpri...

Page 74: ...m 200 to 10 000 ft An operating temperature de rating of 1 C per 1000 feet above 6000 feet is allowed Wind driven rain Refer to Telcordia GR 487 CORE Dust and water ingress Refer to Telcordia GR 487...

Page 75: ...as the inside diameter of the lug and the insulating sleeve Industrial Wire Cable Corp Type MTW Machine Tool Wire FCI Terminal Lug or equivalent 3 8 Bolt Size Straight 2 Hole 1 Center to Center FCI T...

Page 76: ...pter 8 Electrical power requirements for 9927 Distributed Base Station Outdoor Cabinet GPS antenna runs must be installed as described in Chapter 10 Site preparation requirements for 9927 Distributed...

Page 77: ...rovide all flexible conduit and associated fittings to the installer The following table describes the flexible conduits that are required Required conduit Purpose Required Supplies AC conduit Connect...

Page 78: ...otection Association NFPA Basic site preparation requirements and footprints for 9927 Distributed Base Station outdoor cabinet Site requirements for 9927 Distributed Base Station Outdoor cabinet Site...

Page 79: ...able from Alcatel Lucent Concrete pad requirements If cabinets will be installed on a concrete pad the concrete pad must be supplied as part of site preparation and must meet the following requirement...

Page 80: ...customer provided mounting structure or raised platform It is the responsibility of the customer to design the rooftop platform Basic site preparation requirements and footprints for 9927 Distributed...

Page 81: ...e ice bridge must not interfere with access to the connections at the left or right of the 9927 Distributed Base Station cabinet Service access clearances Proper clearance must be provided around the...

Page 82: ...eep1 After 60ECv2 battery cabinet 0 1 2 1 2 inch drop in anchor 4 16 mm bit 5 8 inch 50 mm 2 inches deep Before 3 4 12 mm expansion stud anchor 4 18 mm 11 16 inch bit minimum 101 mm 4 inches deep1 Aft...

Page 83: ...y side Anchoring footprint for 60ECv2 battery cabinet The following diagram shows the 60ECv2 battery cabinet anchoring footprint required for site preparation Basic site preparation requirements and f...

Page 84: ...927 Distributed Base Station outdoor cabinet Site requirements for 9927 Distributed Base Station Outdoor cabinet Anchoring footprints 5 14 Alcatel Lucent Proprietary Use pursuant to applicable agreeme...

Page 85: ...the 9927 Distributed Base Station Outdoor Cabinet Contents Drill anchor holes 5 16 Basic site preparation requirements and footprints for 9927 Distributed Base Station outdoor cabinet Site preparatio...

Page 86: ...2 Mark the surface for all cabinets to be installed Refer to Anchoring footprints p 5 13 for cabinet anchoring dimensions 3 If using the optional drilling template remove the template 4 Drill the anch...

Page 87: ...nstalled as part of cabinet installation by equipment installers Basic site preparation requirements and footprints for 9927 Distributed Base Station outdoor cabinet Site preparation procedures Drill...

Page 88: ...n requirements and footprints for 9927 Distributed Base Station outdoor cabinet Drill anchor holes 5 18 Alcatel Lucent Proprietary Use pursuant to applicable agreements 9927 Dist BTS Outdoor 401 703 5...

Page 89: ...g RRHs in non powered state 6 3 Environmental requirements 6 4 Site requirements for RRHs 6 5 RRH cabinet clearances 6 6 Site requirements for pole mount installations 6 8 Site requirements for wall m...

Page 90: ...ts for RRHs 6 5 RRH cabinet clearances 6 6 Site requirements for pole mount installations 6 8 Site requirements for wall mount installations 6 11 Site requirements for floor stand installations 6 16 B...

Page 91: ...blem prevention To prevent moisture from collecting inside non powered RRHs that are in storage all openings and connectors must be tightly sealed The units should also be covered with a waterproof ta...

Page 92: ...e sea level Extended operating altitude 60 96 to 3048 m 200 to 10 000 ft An operating temperature de rating of 1 C per 1000 feet above 6000 feet is allowed Wind driven rain Refer to Telcordia GR 487 C...

Page 93: ...e preparation checklists of this document for checklists of detailed requirements Structural requirements Pole wall loading and wind must be considered during site preparation In some cases cell site...

Page 94: ...of typical distances between adjacent RRH cabinets These clearances satisfy the minimum clearance requirements Cables provided by Alcatel Lucent Hybriflex cable shall be provided by Alcatel Lucent to...

Page 95: ...utdoor cabinet to the DC Distribution Fiber Management Box Basic site preparation requirements and footprints for RRHs Site requirements for RRHs RRH cabinet clearances 9927 Dist BTS Outdoor 401 703 5...

Page 96: ...ns for the low profile pole mount Low profile small pole mount specifications Standoff mm inches Application Pole diameter mm 40 1 6 Single cabinet installation 50 152 The following figure shows the p...

Page 97: ...wn in the figure below 1900 MHz 4x40W RRH Basic site preparation requirements and footprints for RRHs Site requirements for RRHs Site requirements for pole mount installations 9927 Dist BTS Outdoor 40...

Page 98: ...in the figure below Basic site preparation requirements and footprints for RRHs Site requirements for RRHs Site requirements for pole mount installations 6 10 Alcatel Lucent Proprietary Use pursuant...

Page 99: ...lace if required for mounting cabinet Cabinet wall mounting hardware The following is an example of customer supplied mounting hardware that is required to mount struts to a solid concrete wall 1 5 in...

Page 100: ...H 1900 MHz 4x40W 25 MHz RRH and the 1900 MHz 4x45W 65 MHz RRH Basic site preparation requirements and footprints for RRHs Site requirements for RRHs Site requirements for wall mount installations 6 12...

Page 101: ...he customer as to the location of gas water and electrical pipes or conduits to minimize accidental hazard and equipment damage Also consult with the building engineer as to local code requirements an...

Page 102: ...s of the holes to be drilled in the wall See the figure below 4 Drill holes in the wall at the marked positions using an appropriate concrete drill bit for selected anchor 5 To install the top strut p...

Page 103: ...mount bracket on a Unistrut assembly Basic site preparation requirements and footprints for RRHs Site requirements for RRHs Site requirements for wall mount installations 9927 Dist BTS Outdoor 401 70...

Page 104: ...ds installed in seismic zones 0 through 4 Seismic zone s Anchor type Number of holes Hole size mm inches Hole depth mm inches Torque Nm lbf in 0 1 2 1 2inch Dia drop in 4 16 mm 5 8 in 50 mm 2 in 24 21...

Page 105: ...MHz 4x40W 25 MHz RRH on a floor Basic site preparation requirements and footprints for RRHs Site requirements for RRHs Site requirements for floor stand installations 9927 Dist BTS Outdoor 401 703 51...

Page 106: ...k the location where the Floor Stand anchors will be installed Refer to the above figure for anchoring footprint 2 Drill the anchor holes to the proper size and depth as specified in the previous tabl...

Page 107: ...ere floor stand is available on site Continue with next step 4 Center floor stand over the drilled anchor holes 5 Set and torque the anchor bolts Basic site preparation requirements and footprints for...

Page 108: ...aration requirements and footprints for RRHs Site requirements for floor stand installations 6 20 Alcatel Lucent Proprietary Use pursuant to applicable agreements 9927 Dist BTS Outdoor 401 703 516 Iss...

Page 109: ...site preparation requirements and footprints for DC Distribution Fiber Management Box 9927 Dist BTS Outdoor 401 703 516 Issue 1 March 2012 Alcatel Lucent Proprietary Use pursuant to applicable agreem...

Page 110: ...cabinet One Hybriflex cable leaves the DC Distribution Fiber Management Box and goes to the RRHs Contents Cabinet clearances for DC Distribution Fiber Management Box 7 3 Site requirements for wall mo...

Page 111: ...ation access Rear 50 1 97 Zero rear clearance is allowed using supplied mounting brackets Right 152 4 6 Installation access Left 152 4 6 Installation access Top 152 4 6 Installation access Bottom 304...

Page 112: ...nting hardware that is required for mounting struts to a solid concrete wall 1 5 inch x 1 5 inch Unistrut or equivalent struts 2 M10 3 8 inch x 100 mm 4 inch long Power Stud formerly called Rawl Stud...

Page 113: ...nduits to minimize accidental hazard and equipment damage Also consult with the building engineer as to local code requirements and wall loading information Proceed as follows to install the Unistrut...

Page 114: ...he wall at the marked positions using an appropriate concrete drill bit for selected anchor 5 To install the top strut place the top strut against the wall Drive the anchor bolts into the holes of the...

Page 115: ...ut assembly Basic site preparation requirements and footprints for DC Distribution Fiber Management Box Site requirements for wall mount installation of DC Distribution Fiber Management Box 9927 Dist...

Page 116: ...ment Box The DC Distribution Fiber Management Box is fastened to the wall with bolts via Unistruts Basic site preparation requirements and footprints for DC Distribution Fiber Management Box Site requ...

Page 117: ...stributed Base Station outdoor cabinet 8 5 Power requirements for 9927 Distributed Base Station Outdoor Cabinet 8 6 General requirements 8 7 AC convenience outlet AC PDA and AC line surge protection 8...

Page 118: ...wer systems 8 3 Backup power systems 8 4 Electrical service requirements for 9927 Distributed Base Station outdoor cabinet 8 5 Electrical power requirements for 9927 Distributed Base Station Outdoor C...

Page 119: ...converts site AC power to 48 VDC which powers the cabinet The rectifier module is located inside the cabinet Electrical power requirements for 9927 Distributed Base Station Outdoor Cabinet Power overv...

Page 120: ...VDC battery backup for the 9927 Distributed Base Station Outdoor Cabinet One or two 60ECv2 battery cabinets can be connected to the 9927 Distributed Base Station Outdoor Cabinet The batteries are char...

Page 121: ...se Station Outdoor Cabinet are listed on the cabinet nameplate They are as follows 120 208 VAC 120 240 VAC 3 wire Gnd 80 A 50 60 Hz Electrical power requirements for 9927 Distributed Base Station Outd...

Page 122: ...cable and service panel requirements 8 10 Power requirements for new site installation of 9927 Distributed Base Station Outdoor Cabinet 8 11 Battery Reserve Times for batteries inside 60ECv2 battery c...

Page 123: ...rent protection must be installed in accordance with the National Electric Code NFPA 70 the Canadian Electrical Code Part 1 CSA C22 1 or the local electrical code in effect An appropriate equipment gr...

Page 124: ...inals for connection of the AC input conductors and the equipment grounding conductor The terminals are configured for either North American 120 240 V 3 wire single phase connections 120 208 V 3 wire...

Page 125: ...art of site preparation Electrical power requirements for 9927 Distributed Base Station Outdoor Cabinet Power requirements for 9927 Distributed Base Station Outdoor Cabinet AC convenience outlet AC PD...

Page 126: ...h 100 A service panel North American installation The following table provides the recommended wire sizes 9927 Distributed Base Station Component Rating Gauge Circuit breaker 100 Amp 2 pole Wire for L...

Page 127: ...The typical and maximum DC power requirement and number of rectifiers required for various 9927 Distributed Base Station Outdoor Cabinet configurations are provided in Engineering Rules for Factory a...

Page 128: ...s connected in series Battery Reserve Times for battery strings inside 60ECv2 battery cabinet powering 10 500 watt load One string Two 12IR145 145 Ah batteries connected in series Number of battery st...

Page 129: ...wer to the RRHs when the RRHs are up to 15 m from the 9927 Distributed Base Station Outdoor Cabinet Contents Power requirements general 9 2 Power consumption 9 3 DC power requirements for RRHs 9 4 992...

Page 130: ...for the RRHs at full rated output power are as follows RRH Full rated output power at 48 VDC 1900 MHz 4x40 W 690 Watts 15 Amps 1900 MHz 4x45 W 750 Watts 17 Amps 800 MHz 2x50 W 450 Watts 9 0 Amps Elect...

Page 131: ...levels in the table represent expected maximum load when the heater in the RRH is turned on Power consumption for RRHs The table below lists the power consumption values for the two types of RRHs Powe...

Page 132: ...x DC feeders from 9927 Distributed BTS outdoor cabinet to DC Distribution Fiber Management Box Voltage DC Nominal Feeders 1 and 2 Circuit Breaker AMPS Wire Gauge Max Length 48 VDC 90 35 mm 2 AWG 10 7...

Page 133: ...equirements for 9927 Distributed Base Station Outdoor cabinet GPS antenna and microwave antenna cable 9927 Dist BTS Outdoor 401 703 516 Issue 1 March 2012 Alcatel Lucent Proprietary Use pursuant to ap...

Page 134: ...neral requirements 10 3 Site preparation for GPS antenna 10 4 Site preparation for microwave antenna cables 10 6 Site preparation requirements for 9927 Distributed Base Station Outdoor cabinet GPS ant...

Page 135: ...cables or equivalent must be used All antenna cable runs must be appropriately supported in accordance to the connector and cable manufacturer s instructions Antenna and cable sweeps must be made bef...

Page 136: ...a connections are shown in the following diagram Recommended GPS antenna cable Important The recommended cable type should be outdoor UV and riser fire retardant rated The following table provides inf...

Page 137: ...115 GPS antenna cable lengths The following table provides GPS antenna cable lengths information for various configurations Cable type GPS antenna gain dB Maximum cable length 1 m feet LDF4 26 75 245...

Page 138: ...g site preparation it is the customer s responsibility to label the end of each microwave cable so that the installer can easily identify each cable and connect it properly at installation Label each...

Page 139: ...turer s instructions as outlined in Grounding and Lightning Protection Guidelines for Alcatel Lucent Network Wireless System Cell Sites 401 200 115 Site preparation requirements for 9927 Distributed B...

Page 140: ...ibuted Base Station Outdoor cabinet GPS antenna and microwave antenna cable Site preparation for microwave antenna cables 10 8 Alcatel Lucent Proprietary Use pursuant to applicable agreements 9927 Dis...

Page 141: ...overview of RF antenna interface requirements for RRHs Contents Antenna requirements 11 2 Surge protection requirements 11 3 General antenna cable requirements 11 4 9927 Dist BTS Outdoor 401 703 516 I...

Page 142: ...roviding for grounding surge protection and construction of the support structure Constraints on the antenna position In order to support location based services all antennas that serve a sector must...

Page 143: ...ith a surge protector RF surge protection is not required for standard star configurations one RRH per sector RF antenna cable requirements for RRHs Surge protection requirements 9927 Dist BTS Outdoor...

Page 144: ...on Antenna installations shall be performed in accordance with all applicable manufacturer s recommendations and national laws and regulations To ensure correct antenna installation all necessary calc...

Page 145: ...ansmit receive diversity The RF antenna cable must satisfy the following requirements Impedance 50 ohms Attenuation 3 dB Antenna jumper cable at the baseband cabinet end must be equipped with a 7 16 D...

Page 146: ...RF antenna cable requirements for RRHs General antenna cable requirements 11 6 Alcatel Lucent Proprietary Use pursuant to applicable agreements 9927 Dist BTS Outdoor 401 703 516 Issue 1 March 2012...

Page 147: ...formation on grounding and lightning protection requirements for a 9927 Distributed Base Station Outdoor Cabinet site Contents Grounding requirements 12 2 Surge protection requirements 12 3 Grounding...

Page 148: ...grounding conductors NOTICE Equipment Warranty The equipment warranty can be voided if the guidelines in the National Electrical Code NFPA 70 the Canadian Electrical Code Part 1 CSA C22 1 or the loca...

Page 149: ...on device must be installed between each antenna coaxial cable and jumper cable approximately 1 meter 3 ft away from the equipment They can be obtained from Alcatel Lucent KS24577 L 3A for GPS and KS2...

Page 150: ...CABINET 6 AWG STRANDED INSULATED COPPER WIRE INSULATION TO BE UV RESISTENT FOR GROUNDING SUPPORT STRUCTURE 6 AWG STRANDED INSULATED COPPER WIRE FOR GROUNDING SURGE PROTECTION DEVICE INSULATION TO BE...

Page 151: ...am shows a typical method for grounding an antenna cable outer shield DOUBLE HOLE LUG TO BUS BAR 6 AWG STRANDED INSULATED COPPER GROUND WIRE ANTENNA CABLE CABLE GROUND KIT Grounding and lightning prot...

Page 152: ...erior ground conductors must be at a minimum 33 6 mm2 2 AWG either solid bare tinned copper or stranded insulated outdoor insulation to be sunlight resistant copper cable Exothermic weld Exothermic we...

Page 153: ...ted Base Station Outdoor Cabinet site on a concrete pad Surge Protection Device Grounding and lightning protection requirements for 9927 Distributed Base Station Outdoor Cabinet Grounding electrode sy...

Page 154: ...ted Base Station Outdoor Cabinet site on a rooftop Surge Protection Device Grounding and lightning protection requirements for 9927 Distributed Base Station Outdoor Cabinet Grounding electrode system...

Page 155: ...discusses grounding and lightning protection requirements for the RRHs Contents Grounding and surge protection requirements 13 2 Grounding examples Remote Radio Head 13 3 9927 Dist BTS Outdoor 401 703...

Page 156: ...h internal surge protectors No external surge protectors are required Grounding and lightning protection requirements for RRHs Grounding and surge protection requirements 13 2 Alcatel Lucent Proprieta...

Page 157: ...net must be grounded as follows 1 At the top of cabinet 2 At the right side of cabinet Grounding and lightning protection requirements for RRHs Grounding examples Remote Radio Head 9927 Dist BTS Outdo...

Page 158: ...installations two RRHs per sector 35 mm 2 AWG 2 To system grounding 35 mm 2 AWG 2 2 AWG to 2 AWG 2 AWG to 2 AWG To system Grounding electrode ground rod See Important Note Surge protector for antenna...

Page 159: ...ctor a grounding bus bar must be installed within 6 feet of the RRHs to ground the antenna sharing surge protector 35 mm 2 AWG 2 2 AWG to 2 AWG To grounding electrode ground rod 35 mm 2 AWG 2 35 mm 2...

Page 160: ...g and lightning protection requirements for RRHs Grounding examples Remote Radio Head 13 6 Alcatel Lucent Proprietary Use pursuant to applicable agreements 9927 Dist BTS Outdoor 401 703 516 Issue 1 Ma...

Page 161: ...to T1 E1 and User Alarm facilities for 9927 Distributed Base Station Outdoor Cabinet Contents Balun Block requirements 14 2 Site preparation for T1 E1 and User Alarm cables 14 3 Specify assignments f...

Page 162: ...ovider Balun Block Note 1 T1 E1 Cable See Note 2 Coaxial cable NOTE 1 The Balun Block must be located within a 10 m 35 foot cable length distance from the radio cabinet NOTE 2 RJ 45 connectors must be...

Page 163: ...binet varies depending upon the number of SEC B installed in the cabinet Four T1 E1 lines go to each SEC B Number of User Alarm cables The 9927 Distributed BTS is equipped with an M5PM alarm module wh...

Page 164: ...tallation of the primary protector For international applications refer to ITU K 11 Principles of Protection Against Over voltages and Over currents Important Unused or spare T1 E1 cables at the NIU m...

Page 165: ...larm cables through the conduits After the T1 E1 and User Alarm cables have been connected to the NIU and the conduits have been installed the T1 E1 and User Alarm cables must be routed through the NI...

Page 166: ...w must be completed as part of site preparation SEC B T1 E1 Line Function Tx Rx RJ 45 Pinout Wire Color 1 1 Rx ____ T 1 White Orange Rx ____ R 2 Orange White Tx ____ T 4 White Blue Tx ____ R 5 Blue Wh...

Page 167: ...9 Rx ____ T 1 White Orange Rx ____ R 2 Orange White Tx ____ T 4 White Blue Tx ____ R 5 Blue White 10 Rx ____ T 1 White Brown Rx ____ R 2 Brown White Tx ____ T 4 White Green Tx ____ R 5 Green White 11...

Page 168: ...White 15 Rx ____ T 1 Red Blue Rx ____ R 2 Blue Red Tx ____ T 4 White Gray Tx ____ R 5 Gray White 16 Rx ____ T 1 Red Green Rx ____ R 2 Green Red Tx ____ T 4 Red Orange Tx ____ R 5 Orange Red Site prep...

Page 169: ...stance of a closed circuit is less than 100 ohms The resistance of an open circuit is greater than 1 megohm The User Alarm switches if desired must be installed as part of site preparation The 9927 Di...

Page 170: ...ed USERALM7 USERALM23 9 Red Brown USERALM8 USERALM24 28 Brown Red USERALM8 USERALM24 10 Red Gray USERALM9 USERALM25 29 Gray Red USERALM9 USERALM25 11 Black Blue USERALM10 USERALM26 30 Blue Black USERA...

Page 171: ...low USERALM15 USERALM31 Site preparation T1 E1 and User Alarm facilities for 9927 Distributed Base Station Outdoor Cabinet Site preparation for User Alarm cables 9927 Dist BTS Outdoor 401 703 516 Issu...

Page 172: ...Alarm facilities for 9927 Distributed Base Station Outdoor Cabinet Site preparation for User Alarm cables 14 12 Alcatel Lucent Proprietary Use pursuant to applicable agreements 9927 Dist BTS Outdoor...

Page 173: ...for the RRHs The fiber optic cables are contained within the Hybriflex cable Contents General facilities requirements 15 2 Facilities requirements 15 3 Requirements for Hybriflex cable 15 4 9927 Dist...

Page 174: ...optic cables that exit the Hybriflex cable are terminated with LC connectors All facilities must be available before the RRHs can be installed Hybriflex cable specifications General facilities requir...

Page 175: ...the DC Distribution Fiber Management Box Connectors on bottom of RRHs The figure below shows the cable entry points on the bottom of the 800 MHz RRH AUX Rx1 AUX RX2 CPRI PRI CPRI PRI STATUS Tx1 MON T...

Page 176: ...ewtons for installation Maximum tensile load 500 newtons for operation UL 1666 flame retardent UL listed type OFNR An excess cable length must be coiled at one or both ends and properly protected Note...

Page 177: ...nd they are about ___ feet long Each fiber optic cable is terminated at each end with an LC connector All cables are weather and sunlight resistant Shown in the figure below is the RRH end or top end...

Page 178: ...Box goes between the baseband cabinet and the RRHs The DC Distribution Fiber Management Box contains DC surge protectors DC circuit breakers DC terminal blocks Fiber optic cable interface connectors H...

Page 179: ...o up to 24 DC terminal block Must be Installed within 6 1 m 20 feet of the 9927 Distributed BTS outdoor cabinet The block diagram below shows two 1 1 2 liquid tight flexible metallic conduits and one...

Page 180: ...A and B designations are typically imprinted on the LC connector clip The following figure shows a typical fiber cable with LC duplex connectors at the baseband cabinet and RRH end Base station cabine...

Page 181: ...t Contents SP GEN Cell site general information form A 2 SP 1 Site preparation general checklist A 3 SP 2 Site preparation power source checklist A 5 SP 3 Site preparation grounding checklist A 6 SP 5...

Page 182: ...________________________________ Cell Site Access Contact Name ________________________________ MTA Name ________________________________ Cell Site ________________________________ Contact Phone _____...

Page 183: ...Y N N A 6 Will structure support cabinets equipment including batteries etc Y N N A 7 Are all site permits completed Y N N A 8 Has a Method of Procedure MOP been developed with the installation super...

Page 184: ...d and protected for User Alarm Y N N A 19 Has all equipment been ordered and has delivery to site been scheduled Y N N A 20 Have all necessary arrangements been made for access to the site Y N N A 21...

Page 185: ...d labeled for power system Y N N A 7 Is AC circuit breaker s available and labeled for listed ancillary equipment Y N N A A Y N N A B Y N N A C Y N N A 8 Do tower lighting intrusion lighting etc feeds...

Page 186: ...Via grounded building steel 6 Via grounded grid or radial Y N N A 3 Is lighting mast s or air terminal s provided and bonded Y N N A 4 Is antenna support structure s grounded Y N N A 5 Is antenna towe...

Page 187: ...A 16 Is AC power supply equipped with a surge protection device and is the device properly connected to the ground system Y N N A 17 Is T1 E1 line equipped with a surge protection device and is the d...

Page 188: ...de system at both ends if applicable Y N N A 25 Were buried ring ground and its connections inspected before the trench was backfilled Y N N A 26 Was a photo taken of the buried ring ground and its co...

Page 189: ...in the site installation records Y N N A 5 Is proper gain antenna installed for the total aggregate cable loss and length Y N N A 6 Is measured cable VSWR within its specified value Y N N A 7 Is GPS...

Page 190: ...stations collocated equipment etc Y N N A Completed by _______________________________________________________ Date _______________________________________________________ 9927 Distributed Base Stati...

Page 191: ...o that the warranty is not voided 3 Equipment installation hand off to customer or service turn up can occur but not per Alcatel Lucent recommendations Inspection Checklist Completion Sign Off Was the...

Page 192: ...nchlist Item Comment Description Severity 1 2 3 Corrective Action Required Y N Completed Date 9927 Distributed Base Station Outdoor Cabinet site preparation checklists SP 6A Site preparation punchlist...

Page 193: ...EN cell site general information B 2 SP 1 Site preparation general checklist B 3 SP 2 Site preparation power source checklist B 6 SP 3 Site preparation grounding checklist B 7 SP 4 Site preparation RF...

Page 194: ..._________ Cell Site Access Contact Name ______________________ MTA Name ______________________ Cell Site ______________________ Contact Phone ______________________ Site preparation checklists for RRH...

Page 195: ...formation available Y N N A 5 Has installer cell site equipment parameter sheet been completed and reviewed with the installation supervisor Y N N A 6 Are the ECP Switch and cell software generics com...

Page 196: ...22 or 9228 sides Y N N A 16 Has the customer supplied and installled proper fiber between the Splicing Junction Boxes Y N N A 17 Is there a standard 50 ft fiber cable assembly installed and available...

Page 197: ...______________ 2 Date _______ Site preparation checklists for RRHs SP 1 Site preparation general checklist 9927 Dist BTS Outdoor 401 703 516 Issue 1 March 2012 Alcatel Lucent Proprietary Use pursuant...

Page 198: ...breaker s available and labeled for power system Y N N A 7 Is AC DC circuit breaker s available and labeled for listed ancillary equipment Y N N A A Y N N A B Y N N A C Y N N A 8 Do tower lighting int...

Page 199: ...d rod s E Via grounded building steel F Via grounded grid or radial Y N N A 3 Is lighting mast s or air terminal s provided and bonded Y N N A 4 Is antenna support structure s grounded Y N N A 5 Is an...

Page 200: ...c and barbed wire as applicable Y N N A 15 Are all metallic objects within 1 8 meters 6 feet bonded to the grounding system Y N N A 16 Is AC DC power supply equipped with a surge protection device and...

Page 201: ...enna cable runs demarcation points in proper location Y N N A 8 Are antenna cable runs marked and in proper sequence per applicable equipment drawings Y N N A 9 Are appropriate type length and number...

Page 202: ...hatchplate and cable boots properly installed Y N N A Notes 1 Completed by ______________________ 2 Date _______ Site preparation checklists for RRHs SP 4 Site preparation RF antenna checklist B 10 Al...

Page 203: ...handoff to customer or service turn up so that the warranty is not voided 3 Equipment installation handoff to customer or service turn up can occur but not per Lucent recommendations 4 Inspection Che...

Page 204: ...te preparation items Item Comment Description Severity 1 2 3 Corrective Action Required Y N Completed Date Site preparation checklists for RRHs SP 5A Site preparation punchlist sheet B 12 Alcatel Luce...

Page 205: ...Purpose This section is for use by Customer Project Management to document cell site configuration information Contents CSC 1 Cell site configuration information C 2 9927 Dist BTS Outdoor 401 703 516...

Page 206: ...or Controlled Environment Uncontrolled Environment Concrete Pad Rooftop Other Specify ___________________________________________ Base station substructure Check all that apply Concrete Wood floor Rai...

Page 207: ...ntenna KS Model ___________________________________________ PCS Freq Block A F ___________________________________________ GPS Cable Length ft ___________________________________________ GPS Antenna G...

Page 208: ...nt Y N N A Cable Tray or Ladder Racks Type of Ladder check one ____ 5 Ladders ____ 12 Ladders ____ Other ____ Y N N A Antenna Cable Hatch Plate Number of Entry Holes ____ Y N N A Facilities Ancillary...

Page 209: ...nd driven rods ____ Buried metallic and electrically continuous water pipe ____ Down conductors Quantity ____ ____ Electrolytic ground rod s Quantity ____ ____ Driven ground rod s Quantity ____ ____ G...

Page 210: ...Base Station Outdoor Cabinet cell site information CSC 1 Cell site configuration information C 6 Alcatel Lucent Proprietary Use pursuant to applicable agreements 9927 Dist BTS Outdoor 401 703 516 Iss...

Page 211: ...des guidelines for lifting and moving the 9927 Distributed Base Station Outdoor Cabinet cabinets and the 60ECv2 battery cabinet Contents Lifting and moving cabinets D 2 9927 Dist BTS Outdoor 401 703 5...

Page 212: ...east 4 feet long to lift a cabinet attached to a pallet from the bottom Install lifting eyebolts on the top of the cabinet and use a derrick and slings to lift the cabinet from its top Safety precauti...

Page 213: ...lts by following these guideline If a inch eyebolt threads easily and fully into a lifting nut on the top of the cabinet then use the inch eyebolts If not check the threads for 12 mm eyebolts The 12 m...

Page 214: ...to install the lifting eyebolts Install lifting eyebolts on 60ECv2 cabinet Two R ITE 6113 1 2 inch lifting eyebolts are screwed into the lifting nuts on the top of the cabinet as shown in the followi...

Page 215: ...bolts with a B connecting link or clevis When a cabinet is being lifted with slings it is unsafe to lift the cabinet when the lifting sling angle is less than 45 degrees to the top of the cabinet At c...

Page 216: ...line tight to prevent the cabinet from tipping while the cabinet is being moved At the end of the lift slowly place the cabinet on the ground Unsafe if lifting sling angle is less than 45 degrees to t...

Page 217: ...na installation general E 2 RF interference considerations E 4 Lightning interference consideration E 5 GPS antenna mount kit E 9 GPS antenna mounting instructions E 11 Active GPS antenna Standard Wav...

Page 218: ...uadrant should be less than 12 5 of the sphere s surface area The following diagram shows the mask angle definition for the GPS antenna Important Do not install the GPS antenna directly under structur...

Page 219: ...ially during periods of heavy rain or snow Consider if increased summer plant life could also become a problem If a GPS antenna is mounted to a monopole antenna mast it must be mounted a minimum dista...

Page 220: ...antennas microwave transmit dishes and other sources of RF radiation that could affect GPS reception are in close proximity The GPS antenna should not be located within 10 feet horizontally and 10 fee...

Page 221: ...alled such that it is not the highest point in an installation The GPS antenna must not be a lightning rod The GPS antenna must be within the protective cone see Figure on the following page of any gr...

Page 222: ...ot point then horizontal lightning rods must be employed such that the antenna is within the area of a 150 foot sphere that touches both lightning rods as shown in the following diagram GPS antenna in...

Page 223: ...e GPS antenna is mounted on a separate pole or structure of height H near an antenna tower or other grounded structure and the distance D from the pole or structure to the tower or other grounded stru...

Page 224: ...GPS antenna installation Lightning interference consideration E 8 Alcatel Lucent Proprietary Use pursuant to applicable agreements 9927 Dist BTS Outdoor 401 703 516 Issue 1 March 2012...

Page 225: ...diameter Pipe diameter The L Bracket Mount Kit will attach the GPS antenna onto a customer supplied vertical pipe of diameter ranging between 3 4 to 1 12 Important Before installing any components en...

Page 226: ...antity Description 1b 602187 2 1 L Bracket 2 602190 1 Gasket 3b 9845 2 4 10 32 UNF x 0 312 Screw 4b 726042 2 Cleat 5b 9963 131 2 0 25 20 UNCx2 5 Hex Head Cap Screw 6b 9963 256 2 0 25 20 UNCx3 25 Hex H...

Page 227: ...ghten 0 25 inch hardware 3 Insert the cable assembly fitted with N male connector through the Collar Item 1a and Gasket Item 2 Install Captive Screws Item 3a Do not install set screws Items 4a for thi...

Page 228: ...herproofing is not provided with this kit L bracket mount kit Perform the following steps and refer to the following diagram to mount the GPS antenna 1 Attach L Bracket Item 1b to customer supplied ve...

Page 229: ...ly to directly underneath the base plate of the antenna Important Weatherproofing is not provided with this kit Collar mount kit Perform the following steps and refer to the following diagram to mount...

Page 230: ...e 5 Slide assembly down so that the Collar slides over the mounting pipe Tighten Set Screws Item 4a 6 Install weatherproofing that extends from directly underneath the flange on the collar bracket to...

Page 231: ...n powered in this way Calibrate the Wiltron as shown and per the manufacturer s instructions Perform the SWR or DTF measurement as shown and per the manufacturer s instructions Record the MAX SWR indi...

Page 232: ...GPS antenna installation Active GPS antenna Standard Wave Ratio SWR test E 16 Alcatel Lucent Proprietary Use pursuant to applicable agreements 9927 Dist BTS Outdoor 401 703 516 Issue 1 March 2012...

Page 233: ...Engineering Rules for Alcatel Lucent CDMA Modular Cell 4 0B ER_0102_0004_PWR which is the primary source for power requirements and battery backup information for the 9927 Distributed Base Station Out...

Page 234: ...Engineering Rules for Alcatel Lucent CDMA Modular Cell 4 0B ER_0102_0004_PWR Power and Battery Engineering Rules for 9927 Distributed Base Station Outdoor Cabinet Engineering Rules Document F 2 Alcate...

Page 235: ...are determined primarily by national or multinational regulations However in some regions contract terms determine which statements are required The presence of the statement indicates that the produ...

Page 236: ...ertification registration number only signifies that the Industry Canada technical specifications were met Product safety conformance The 9228 Base Station cabinet is Safety Certified ITE by Underwrit...

Page 237: ...at 9228 Base Station cabinet complies with the International Electrotechnical Commission IEC standards IEC 60825 1 Edition 2 0 2007 and IEC 60825 2 Edition 3 1 2007 It is a Class I 1 laser optical fib...

Page 238: ...established For more information regarding collection and recovery of packaging and packaging waste within specific jurisdictions please contact the Alcatel Lucent Services Environmental Health and Sa...

Page 239: ...e Organization CE marking This product has been CE marked in accordance with the following European Directive Radio and Telecommunication Terminal Equipment R TTE 1999 5 EC EMC and radio spectrum comp...

Page 240: ...usion zones for public and installation workers defined The following information on Alcatel Lucent supplied equipment is available from customer representatives Output power and antenna characteristi...

Page 241: ...isk of eye damage Never look into the end of an exposed fiber or an open connector as long as the optical source is switched on Ensure that the optical source is switched off before disconnecting opti...

Page 242: ...a solid bar under the crossed out wheeled bin indicates that the product was put on the market after 13 August 2005 Note 2 For batteries put on the market in the European Union a chemical symbol Hg me...

Page 243: ...n EU Directive 2002 95 EC Restriction of the use of certain Hazardous Substances RoHS restricts the use of lead mercury cadmium hexavalent chromium and certain flame retardants in electrical and elect...

Page 244: ...ikely to cause harmful interference in which case the user will be required to correct the interference at the user s expense FCC Part 15 Class B as marketed Important This equipment has been tested a...

Page 245: ...n order for you to make necessary modifications to maintain uninterrupted service FCC regulations prohibit the connection of customer provided equipment to central office implemented systems Connectio...

Page 246: ...ook into the end of an exposed fiber or an open connector as long as the optical source is switched on Ensure that the optical source is switched off before disconnecting optical fiber connectors Prod...

Page 247: ...ther jurisdictions may require that systems be established for the return and or collection of packaging waste from the consumer or other end user or from the waste stream Additionally reuse recovery...

Reviews: