Check that the flow is in the required direction, reverse as required.
Loosen the pump head housing, rotate and fully tighten home.
The pipework to this high performance pump must be clamped down effectively-
AKW advise and recommend you clamp pipework either side of joints, junctions or
connections and at a maximum of 500mm between other supports
REMOVE SHIPPING
TAPES
from ends.
Refit the pump to the
back plate.
Reconnect cable.
Refit the front cover.
5
6
8
8
Fixing pump to surface
Fit the pump connectors
to the pump. Note 15mm
connector for the inlet.
Screw both ends into
place. No thread sealant
needed, firmly hand
tighten only.
7
Check that you have not overtightened and
distorted the valves before connecting the pipework.
Fully tighten
Flow direction
from the front.
Insert
Insert
Rotate to direction of flow
Loosen