CHAPTER 2
INSTALLATION
Safety Instruction -Trained Personnel Only!
Only trained and qualified personnel should perform installation,
adjustments, and servicing. Only a properly trained and qualified certified electrician should
perform electric installations and service.
Safety Instruction – Installation!
Make the connection of the vehicle and/or auxiliary battery the final step.
2.1 INTRODUCTION
The Universal II has been designed to provide ease of installation. This section of the manual provides the procedures that must be
followed to insure a successful installation. Be sure to read and understand the entire installation procedure before you begin.
Table 2-1 provides a list of tools and materials required to install and test the Universal II.
Wrenches
Deutsch Crimping tool (HDT-48-00)
Screwdrivers
Wire cutter/stripper
#8-32, M4, or M6 Mounting Hardware (4 req’d)
Multimeter (to verify power is turned OFF)
Torque wrench
Clean Shop Rags
Deutsch contact removal tools
Table 2-1 Tools and Materials Required for Installation
2.2 UNPACKING
Unpack the Universal II as follows:
1. Carefully open and remove all parts from shipping container.
2. Inspect for any shipping damage. If damage has occurred, notify carrier.
3. Be sure that all components are included and that the required tools are readily available.