33
Model No:
AC-S10CK_S10HK
Version 1.0
l
Set the both 2-way and 3-way valves to open position with the hexagonal wrench
for the unit operation.
l
Checking a gas leakage for the left piping
F
connect the manifold gauge to the service port of 3-way valve. Measure the
pressure.
F
Keep it for
5~10 minutes
. Ensure if the pressure indicated on the gauge is as
same as that of measured at the first time.
l
Follow the result of right side piping.
l
The additional gas for air purging has been charged in the outdoor unit. However,
if the flare connections have not been done correctly and gas leaks a gas cylin-
der and the charge set will be needed.
Summary of Contents for AC-S10CK
Page 24: ...24 Model No AC S10CK_S10HK Version 1 0 F Cut the cable a 1 5m longer than the pipe length ...
Page 50: ...50 Model No AC S10CK_S10HK Version 1 0 2 Exploded view of outdoor unit for model AC S10CK ...
Page 51: ...51 Model No AC S10CK_S10HK Version 1 0 3 Exploded view of outdoor unit for model AC S10HK ...