background image

ICE CEA/CGA1012–1060 Wall Mount AC I&O Manual 

03/2021 Rev.1

37

that the suction pressure drops and the discharge pressure rises when the compressor is energized. An 

alternate method of verification for self contained system with small critical refrigerant charges, where 

the installation of gauges may be objectionable, can be made by monitoring the temperature of the 

refrigerant lines at the compressor. The temperature should rise on the discharge line while the suction 

line temperature decreases. Reverse rotation also results in a substantially reduced current draw when 

compared to tabulated values.
There is no negative impact on durability caused by operating three phase compressors in the reversed 

direction for a short duration of time, usually defined as less than one hour. However, after several 

minutes of operation the compressor's internal protector will trip. The compressor will then cycle on 

the protector until the phasing is corrected. Reverse operation for longer than one hour may have a 

negative impact on the bearings.

 

To change the rotation, turn off power to the unit and reverse L1 & L2 at the disconnect in the air 

conditioner.

High Voltage Wiring - (Single Units)

The power supply should have the proper voltage, phase, and ampacity for the selected model. 

1.  Refer to the electrical data on the data sticker on the unit for field wiring requirements of the unit. 

Size the incoming power supply lines and the fuse(s) or HACR breaker(s) according to requirements 

described in the National Electric Code. Run the power conductors through the knockouts on the 

side or back of the unit. Use appropriate conduit and strain reliefs.

 CAUTION

Note: Power supply service must be within allowable range (+10% - 5%) of rated 

voltage stamped on the unit rating plate. To operate nominal 230/208V unit at 208V, 

change the transformer line tap from 240V to 208V following the instruction on 

wiring label in unit.

2.  Connect the wires to the input side of the internal breaker or terminal block (L1 & L2 for single-

phase units; L1, L2, & L3 for three-phase models). 

3.  Install the ground wire on the ground lug.
4.  For units designed for operation on 208/230V, 60Hz power supply, the transformer is factory wired 

for a 230V power supply. For a 208V power supply, remove the orange lead from the transformer 

and connect the red lead. Insulate the orange lead.

5. 460V units have a step down transformer for 230V motors.

 

CAUTION

The external breaker(s) that provide power to the air conditioner must be sized per 

the maximum Fuse Size (MFS) shown on the Unit's data label. 

Summary of Contents for CEA1012A

Page 1: ...Chapter 3 Installation 29 Chapter 4 Start Up 40 Chapter 5 Troubleshooting 41 Chapter 6 Maintenance 44 Chapter 7 Warranty 45 Chapter 8 Start Up Checklist 46 Appendix A Fresh Air Damper Installation 50...

Page 2: ...t down on its side may cause oil to leave the compressor and breakage or damage to other components 3 TURN ELECTRICAL POWER OFF AT THE breaker or fuse box BEFORE installing or working on the equipment...

Page 3: ...instructions on the inside of the building adjacent to the thermostat END USER Retain these instructions for future reference Table of Contents Chapter 1 Description Specifications 1 1 General Descrip...

Page 4: ...5b Second Stage Cooling Speed 20 Figure 6 Output Termination for Indoor Motor Control Signal 21 Figure 7 Outdoor Motor Speed Setting 21 Figure 8 Output Termination for Outdoor Motor Control Signal 21...

Page 5: ...y The CEA CGA Product Data Sheets have detailed information on the capacities and efficiencies for each model See Appendix A for instructions on field installation of electric heat ICE CEA CGA air con...

Page 6: ...Start w Low Ambient CCH EFS W Low Ambient w CCH X Hot Gas Bypass Y Low Ambient w CCH FCC Z Low Ambient w CCH EFS 1 Low Ambient w FCC 2 Low Ambient w FCC EFS 3 CCH w Hot Gas Bypass None 17 Indoor Air...

Page 7: ...x 635 x 25 93181 1 8 CEA CGA1020 1024 25 x 16 x 2 635 x 406 x 52 80137 1 8 CEA CGA1030 1036 30 x 16 x 2 762 x 406 x 52 80138 1 8 CEA CGA1042 1048 1060 36 x 22 x 2 927 x 559 x 52 80162 1 8 Table 2 Ret...

Page 8: ...e thermostat brings on mechanical cooling A built in adjustable minimum position potentiometer controls the amount of outdoor air admitted to meet minimum ventilation requirements 1 6 Optional Control...

Page 9: ...ity to add humidity to the building IMPORTANT The electrical wire and breaker or fuses must be sized for simultaneous operation of the electric heater and the air conditioner Refer to the data sticker...

Page 10: ...which allow the units to operate in extremely cold temperatures The kit includes a suction line accumulator thermal expansion valve TXV crankcase heater hard start kit and an outdoor thermostat and fa...

Page 11: ...s primary power is available The heater drives liquid refrigerant from the crankcase and prevents loss of lubrication caused by oil dilution Power must be applied to the unit for 24 hours before start...

Page 12: ...12 ICE CEA CGA1012 1060 Wall Mount AC I O Manual 03 2021 Rev 1 Figure 1a Typical Electrical Schematic CEA CGA Non Economizer...

Page 13: ...ICE CEA CGA1012 1060 Wall Mount AC I O Manual 03 2021 Rev 1 13 Figure 1b Typical Electrical Schematic CEA CGA Economizer...

Page 14: ...hangeover to outside air for free cooling The control board must be configured for proper operation of the economizer by selecting the desired changeover temperature The desired temperature is selecte...

Page 15: ...nimum Position Potentiometer W2 jumper The potentiometer controls the amount of outside air introduced in the building when the economizer damper closes or the air conditioner is Off or in Mechanical...

Page 16: ...mper Honeywellenthalpyanddrybulbsensorsarecurrentlytheonlybrandofsensorsusedintheairconditioners Jumper W3 allows us to use alternative brands at a future date On all current air conditioners pins 1 2...

Page 17: ...Potentiometer 0 to 100 Factory setting is 50 2 Field connection from CommStat 4 2 terminal 5 For Honeywell sensors 8 W2 Minimum Position Potentiometer Jumper Jumper Pins 1 2 to Disable Factory settin...

Page 18: ...ommunicatingvaluable information to the end user Special features include 2 Stage operation with varying speed control to optimize latent and sensible capacity built in remote communication MODBUS for...

Page 19: ...ssure Switch LP Low Pressure Switch Switch to Be Closed for Cooling Operation Switch to Be Connected to R Node 16 24 VAC Power Input to PCB 17 Digital Outputs 24 VAC The PCB Makes and Breaks R RH Rehe...

Page 20: ...signal terminations must be used This jumper will be factory installed In replacing the PCB verify the necessary signal and configure the board accordingly Only 2 of the 3 pins should be used for the...

Page 21: ...entiometer See figure below 3 1 2 1 Set for 0 10V Signal Jumper To Remain On The Appropriate Terminal For Correct Operation 2 Set For PWM Signal Jumper To Remain On The Appropriate Terminal For Correc...

Page 22: ...cond The board also allows 15 different MODBUS addresses based on the position of the NET ADDRESS DIP switches The Net Addresses are written in Binary see table below with switch 4 being the least sig...

Page 23: ...missioning startupsequence to ensure safety and system reliability This document is only valid if the system is used as intended This section defines the manner and method of control of the HVAC syste...

Page 24: ...llows 1 Stage 2 Cooling Request Y2 Input 2 Stage 1 Cooling Request Y1 Input 3 Electric Heat Request W2 Input 4 Dehumidification Request Hum Input 5 Indoor Fan Request G Input Note The priority list ab...

Page 25: ...Only CC1 output can achieve partial capacity Both CC1 and CC2 outputs are required to achieve full capacity Request Active Input Active Output Stage 1 Cooling 1 Fixed Compressor Y1 CC1 Partial Capaci...

Page 26: ...g operation In the event that the fault occurs a second time on the same call for cooling the system locks out To clear the fault the Cooling request must be cycled or the system must be power cycled...

Page 27: ...or has to be configured via MODBUS Once configuration is complete the unit has the capability to function autonomously to maintain the space temperature Discrete Registers Read with Function Code 02 W...

Page 28: ...g 16 Bit 1 60 default 25 represents minutes of allowed MODBUS inactivity before switching to onboard T Stat mode RW 10 Current OFM Speed 16 Bit 0 1023 RO 11 Current IFM Speed 16 Bit 0 1023 RO 12 Anti...

Page 29: ...l not start makes excessive noise or will not pump return the unit to the freight carrier 3 2 Installation Requirements General 1 Inspect unit for completeness Check for missing parts e g hardware Ref...

Page 30: ...inches 61 cm 6 inches 15 cm 20 24 30 inches 76 cm 18 inches 46 cm 24 inches 61 cm 6 inches 15 cm 30 36 30 inches 76 cm 18 inches 46 cm 24 inches 61 cm 6 inches 15 cm 42 48 60 30 inches 76 cm 30 inche...

Page 31: ...6 28 x 8 711 mm x 203 mm P N 80675 For CEA CGA1042 1048 1060 30 x 10 762 mm x 254 mm P N 80676 Return Grilles For CEA CGA1020 1024 20 x 12 508 mm x 305 mm P N 80677 For CEA CGA1030 1036 28 x 14 711 mm...

Page 32: ...miliar with all precautions and safety procedures required in such work and is equipped with the proper tools and test instruments 3 4 Porting and Duct Work General Information Note The following inst...

Page 33: ...nditioners Wall Sleeve for CEA1012 one ton air conditioners with an economizer A wall sleeve is required for all installations of the CEA1012 one ton air conditioner if equipped with an economizer The...

Page 34: ...ir leakage Do not use duct liner on inside of supply duct within 4 feet 122cm of the unit Galvanized metal duct extensions should be used to simplify connections to duct work and grilles Use fabric bo...

Page 35: ...the bottom support bracket mounted on the wall You must stabilize the unit on the bracket with the lifting device or by some other means the bracket alone is not sufficient 3 Make sure that the duct...

Page 36: ...property damage Turn off electrical power at fuse box or service panel BEFORE making any electrical connections and ensure a proper ground connection is made before connecting line voltage Important...

Page 37: ...ng Single Units The power supply should have the proper voltage phase and ampacity for the selected model 1 Refer to the electrical data on the data sticker on the unit for field wiring requirements o...

Page 38: ...he thermostat should be located so that the supply air from the unit does NOT blow directly on to the thermostat Connect the thermostat to the terminal block in the air conditioner as shown in Figures...

Page 39: ...C C NO Dry Contacts NC C NO Dry Contacts NC C NO Dry Contacts NC C NO High Building Temp Alarm Dry Contacts NC C NO 5 Connect to Normally Closed NC dry contacts from smoke alarm SMOKE ALARM JUMPER NOT...

Page 40: ...onomizer Equipped models only To check the system operation under different ambient conditions the air temperature and enthalpy sensors must be tricked When outdoor ambient condi tions are higher than...

Page 41: ...oting Start with a visual check are there loose wires crimped tubing missing parts etc Begin deeper analysis only after making this initial inspection The troubleshooting information in this manual is...

Page 42: ...n in refrigerant circuit 2 Check for blockage or restriction especially filter drier and capillary tube assembly 3 Refrigerant overcharge following field service 3 Evacuate and recharge to factory spe...

Page 43: ...and to each compressor terminal to test the motor windings A short circuit at high voltages indicates a motor defect Do not do this test under vacuum 5 On single phase models check the capacitor by su...

Page 44: ...before restarting Condenser Periodicallyinspecttheoutdoorcondensercoilandthecabinetairreliefsfordirtorobstructions Remove foreign objects such as leaves paper etc If the condenser coil is dirty it ma...

Page 45: ...r any other material charges 2 Damages caused by shipping accident abuse negligence misuse fire flood or Acts of God 3 Damages caused by operating or staging the unit in a corrosive environment 4 Dama...

Page 46: ..._____________ Address ________________________________________State________________________ City ___________________________________________ ICE Air conditioner Model No ______________________________...

Page 47: ...s L1 L2_______V L1 L3 ________V L2 L3______V L1 L2 L1 L3 L2 L3 3 Avg Voltage _______________ Max Deviation from avg voltage ______________volts Voltage imbalance 100 x Max Deviation avg Voltage ______...

Page 48: ...mp ________ ________ Evap Leaving Air WB Temp ________ ________ Heater Contactor Amps L1 ________ ________ Heater Contactor Amps L2 ________ ________ Heater Contactor Amps L3 ________ ________ E Cooli...

Page 49: ...essor Amps L3 ________ ________ Notes _________________________________________________________________________ _________________________________________________________________________ ______________...

Page 50: ...four sides of the supply outlet duct flange on the unit The 1 25 4 mm clearance must extend on all sides of the supply duct for the first 3 feet 1 meter from the unit IMPORTANT ICE requires a minimum...

Page 51: ...ther heaters 6 Install the two No 10 screws in the heater assembly plate 7 Install wire harness in hole provided in drain pan and then through filter bracket and then into control box 8 Wire the heate...

Page 52: ...52 ICE CEA CGA1012 1060 Wall Mount AC I O Manual 03 2021 Rev 1...

Reviews: