5
Installation instruction
Note:
1. Install adapter to change wind direction at the gas short circuit place.
2. When installing multiple units, there should be enough air inlet place
against air in short circuit.
3. In snowy area, install the unit under the bracket or the snow-proof
cover against the accumulative snow on the unit.
4. Do not install the unit at the place where the flammable gas will leak.
5. Install the unit at the strong enough place.
6. Install the unit at the flat place.
7. When the refrigerant pipe is leaded out from the bottom of the unit,
the below section should be a bracket with over 500mm height, see
below figure.
8. When being installed at the place with strong wind, set the air outlet of the unit and the wind
direction vertical. Also fix the unit with the screw.
9. When opening the electric box cover for maintenance, please fix the cover with screw firmly.
Air outlet snow
-proof cover
Air inlet snow
-proof cover
Over 500mm
Refrigerant pipe
Over
200mm
Over
200mm
M12 foundation screw
8~10HP: 4 pieces
12~16HP: 6 pieces
(3) Transportation
•
In transportation, please don't dismantle the
packaging, and move the unit to the installation
location as closely as possible.
•
Don't hang the unit only at two points. When hanging
the unit, don't sit on the unit. The unit should be upright.
•
When removing the unit with the forklift, put the fork
into the special hole at bottom of the unit. When being
hanged, the rope should be 4 pieces of steel cable with
over 6mm diameter.
•
Put the cushion at the contact section between steel
cable and the unit against the distortion or damage.
Note:
There should be no obstacles in 2000mm above the top
of outdoor unit;
Obstacles around outdoor unit should be less than
800mm to the bottom of unit.
When multiple modules are installed, the outdoor unit
should be in ranked as the capacity, the larger capacity is
closer to the main pipe of gather pipe.
Steel cable
Bottom plate
Steel cable
Cushion
20
No obstacle within 2000mm
Below 800mm