10
Installation procedure
Anti-fouling measures
Pipe specification:
First, clean the pipe.
Position
Installation period
Measures
Outdoor
More than 1 month
Flat the pipe end
Less than 1 month
Flat the pipe end or seal with adhesive tape
Indoor
Nothing to do with period
a
c
b
f
b
g
g
Outdoor gather pipe
The first branch pipe
g
c
d
e
d
d
a
a
a
a
a
a
Outdoor
unit
Indoor unit
Indoor unit
Intdoor
unit
Indoor unit
Indoor unit
Indoor unit
VP
VP
VP
Outdoor
unit
Outdoor
unit
Outdoor
unit