Re-installation while the outdoor unit need to be repaired
Installation
77
Be sure to check the gas leakage.
7. Re-installation while the outdoor unit need to be repaired
7.1. Evacuation for
the whole system
Procedure:
1). Confirm that both the 2-way and 3-way valves are set to the opened position.
2). Connect the vacuum pump to 3-
way valve’s service port.
3). Evacuation for approximately one hour. Confirm that the compound meter indicates -0.1Mpa.
4). Close the valve (Low side) on the charge set, turn off the vacuum pump, and confirm that the gauge
needle does not move (approximately 5 minutes after turning off the vacuum pump).
5). Disconnect the charge hose from the vacuum pump.
Summary of Contents for johnson JOAU-ZCY218-H11
Page 13: ...Indoor Units Indoor Units 11 Part 2 Indoor Units DKH Type 12 Light Commercial 22 ...
Page 36: ...Dimensions 34 Indoor Units ...
Page 38: ...Service Space unit mm 36 Indoor Units 3 3 Console ...
Page 40: ...Wiring Diagrams 38 Indoor Units JOSI DCD012 N11 JOSI DAQ012 N11 ...
Page 51: ...Dimensions 50 Outdoor Units JOAU ZCY536 H11 ...
Page 55: ...Wiring Diagrams 54 Outdoor Units 4 Wiring Diagrams JOAU ZCY218 H11 JOAU ZCY327 H11 ...
Page 56: ...Wiring Diagrams Outdoor Units 55 JOAU ZCY430 H11 JOAU ZCY536 H11 ...