Installation for the first time
Installation
73
Be sure to use a torque wrench to tighten the service port cap to a torque 18N
·
m.
Be sure to check the gas leakage.
4.3. Adding the refrigerant if the pipe length >5m
Procedure:
1). Connect the charge hose to the charging cylinder, open the 2-way valve and the 3-way valve.
Connect the charge hose which you disconnected from the vacuum pump to the valve at the bottom of the
cylinder. If the refrigerant is R410A, make the cylinder bottom up to ensure the liquid charge.
2). Purge the air from the charge hose.
Open the valve at the bottom of the cylinder and press the check valve on the charge set to purge the air (be
careful of the liquid refrigerant).
3) Put the charging cylinder onto the electronic scale and record the weight.
4) Operate the air conditioner at the cooling mode.
5) Open the valves (Low side) on the charge set and charge the system with liquid refrigerant.
6).When the electronic scale displays the proper weight (refer to the table), disconnect the charge hose from
the 3-
way valve’s service port immediately and turn off the air conditioner before disconnecting the hose.
7). Mount the valve stem caps and the service port
Use torque wrench to tighten the service port cap to a torque of 18N.m.
Be sure to check for gas leakage.
Electronic scale
Summary of Contents for johnson JOAU-ZCY218-H11
Page 13: ...Indoor Units Indoor Units 11 Part 2 Indoor Units DKH Type 12 Light Commercial 22 ...
Page 36: ...Dimensions 34 Indoor Units ...
Page 38: ...Service Space unit mm 36 Indoor Units 3 3 Console ...
Page 40: ...Wiring Diagrams 38 Indoor Units JOSI DCD012 N11 JOSI DAQ012 N11 ...
Page 51: ...Dimensions 50 Outdoor Units JOAU ZCY536 H11 ...
Page 55: ...Wiring Diagrams 54 Outdoor Units 4 Wiring Diagrams JOAU ZCY218 H11 JOAU ZCY327 H11 ...
Page 56: ...Wiring Diagrams Outdoor Units 55 JOAU ZCY430 H11 JOAU ZCY536 H11 ...