Indoor unit installation
182
Installation
3.1.3 Install the pendant bolt
Select the position of installation hooks according to the hook holes positions showed in upper picture.
Drill four holes of Ø12mm, 45~50mm deep at the selected positions on the ceiling. Then embed the
expansible hooks (fittings).
3.1.4 Install the main body
Make the 4 suspender through the 4 hanger of the main body to suspend it. Adjust the hexangular nuts on
the four installation hooks evenly, to ensure the balance of the body. Use a leveling instrument to make sure
the levelness of the main body is within
±
1
°
.
Adjust the position to ensure the gaps between the body and the four sides of ceiling are even. The body's
lower part should sink into the ceiling for 10~12 mm. In general, L is half of the screw length of the
installation hook.
Locate the air conditioner firmly by wrenching the nuts after having adjusted the body's position well.
Summary of Contents for AWAU-YLD012-H11
Page 14: ...Dimensions Console Type 135 2 Dimensions AWSI XAD012 N11 AWSI XAD018 N11 ...
Page 15: ...Service Space 136 Console Type 3 Service Space ...
Page 16: ...Wiring Diagrams Console Type 137 4 Wiring Diagrams AWSI XAD012 N11 AWSI XAD018 N11 ...
Page 21: ...Field Wiring 142 Console Type 10 Field Wiring AWSI XAD012 N11 AWSI XAD018 N11 ...
Page 31: ...Wiring Diagrams 152 Outdoor Units 4 Wiring Diagrams AWAU YLD012 H11 ...
Page 33: ...Wiring Diagrams 154 Outdoor Units AWAU YLD036 H13 AWAU YLD048 H13 ...
Page 34: ...Wiring Diagrams Outdoor Units 155 AWAU YLD060 H13 ...