
AirStar 1900/1200 5G Sub-6 GHz Full gNB/RDU
2T2R Indoor Radio Unit – Installation Guide
© Copyright Airspan Networks Ltd., 2022
P/N:
DUG01084
Rev. A0.6, Mar 2022
8
3
Verifying Prerequisites
Prior to installing the AirStar 1900/1200 5G Sub-6Hz, verify the required safety, power, tools, parts
and components. This chapter includes the hardware, software, and client requirements for
installation.
Important:
Set up requirements for the installation is detailed in the Job Sheet, see
3.1
Verifying Site Requirements
To set up the AirStar 1900/1200 5G Sub-6Hz, an IP connection to a Network Management System
(NMS) is required.
3.2
Verify Installation Requirements
3.2.1
Verify the Tools
Table 2. Minimum Hardware Requirements
Tool
Use
Philips screwdriver (PH2)
For securing the Wall mounting bracket base, and securing the
Ceiling adaptor bracket
5/32” Allen wrench
For ¼-20 screws – Ceiling adaptor to Pole, Hanger and Extension
coupler
3/32” Allen wrench
For 8-32 screws – Locking screw and GPS bracket
3.2.2
Verify the Parts and Kits
Table 3. Parts & Kits
Installation Kit / Part
Part No.
Consisting of:
Image
AirStar 1900/1200 5G
Sub-6 unit
AR19-N48-DP4C1S
AirStar 1900/1200 5G Sub-6
GPS antenna
PoE++ a US cable cord with Plug
type B
Ceiling mounting kit
AirStar 1900/1200 5G
Sub-6 Ceiling
Mounting Kit
Ceiling base bracket
Basic pole
Hanger
Top cover
Bottom cover
Hardware