Installation Data
Lifting
Whenever a unit is lifted, it should be from the base and, where possible, with all packing and protection in position. If
any type of slinging is used, due care should be taken to ensure that the slings do not crush the casework.
IMPORTANT
If the unit is dropped, it should immediately be checked for damage and reported to Airedale.
Positioning & Levelling
The unit should be positioned on a stable and even base. With the use of a spirit level the base should be levelled to
ensure good condensate removal and prevent door misalignment.
Positioning the unit should be achieved by the use of rollers or skids. Crowbars must not be used as they impose a point
load on the unit frame which may cause damage and distortion.
● Check the unit is as ordered. Discrepancies or transit damage should be reported to Airedale immediately.
● This small footprint unit is relatively tall and heavy. Care should be taken during handling and lifting, that the unit is
well supported and properly balanced.
● Observe airflow and maintenance clearances
● Check all services are present and accessible
CAUTION
Airedale will accept no responsibility for mishandling during the positioning of the equipment.
Unpacking
The unit is to be carefully unpacked. Inspected and any damage reported to Airedale immediately.
All packaging is to be recycled accordingly.
SmartCool™ 6 - 200kW
Precision Air Conditioning
38
SmartCool 6 - 200kW Chilled Water Technical Manual 7674716 V1.10.0_10_2018