
Installation and Maintenance Manual
27
8.
SERVICE & MAINTENANCE
Heat exchangers
Air
Change Sensible Heat Exchangers
IMPORTANT
Outdoor air filters must be changed/cleaned regularly to ensure airflow is unrestricted.
The heat exchanger warranty may be voided if filters are not cleaned according to
maintenance schedule and if proper filtration standards are not adhered to.
Note: Air Change can provide a heat exchanger replacement service on request.
WARNING
Switch off unit before attempting to remove parts for cleaning.
The Sensible Heat exchanger has clear Mylar heat exchange media between the plates which can
be wiped over with a damp cloth or gently hosed clean.
Maintenance Schedule
WARNING
Always disconnect line voltage before servicing electrical equipment. Ensure there are
no loose electrical connections at services intervals.
IMPORTANT
Failure to carry out regular maintenance with a licensed and reputable refrigeration
company may render warranty claims invalid if faults have been caused by lack of
proper maintenance. Air Change may request to see the maintenance schedule
carried out.
General
Air Change systems are designed for easy maintenance, with highest quality materials and
components used throughout.
Preventative maintenance programs will vary according to actual working conditions and location
and hours of usage by the client.
Air Change will be pleased to provide expert advice on special service requirements for particular
installations.
Cooke Industries - Phone: +64 9 579 2185 Email: [email protected] Web: www.cookeindustries.co.nz