Installation-, Operating-, Maintenance-Manual, Spare Part List
BCR04
AGT-PSG GmbH & Co.KG
Errors and printing mistakes excepted
Page 11
Translation - Manual BCR04 Rev. 6/2017
Assembly and Installation
Electrical Connections
All operations mentioned below to be performed by qualified personnel only.
DANGER! Supply voltage!
Be sure to check the local codes in your area. The electrical
connection and the safety systems have to apply. Before connecting the unit to the electrical
supply, verify carefully the data nameplate for the proper electrical information.
WARNING! Automatic start!
After you built up the electrical connections, the cooler can start
automatically.
The sample gas cooler has to be installed as shown at the circuit diagram. The cross section of the power
supply cables must comply with the consumption of the dryer, while keeping into account also the
ambient temperature, the conditions of the mains installation, the length of the cables, and the
requirements enforced by the local power provider.
Also requirements of VDE 0100 as well as relevant standards and guidelines must be adhered to while
setting up high-voltage devices with rated voltages of up to 1000V.
The local protection of the sample gas cooler is provided by the customer. The technical data is
mentioned on the model type plate and in the technical data sheet.