
1
3
Batte
r
y Management Functionality
E7495A/B Manual Verification
•
Verify that the Front Panel Battery LED’s accurately indicates
the correct status of the battery(s) installed in the Test Set.
Battery 1:
(Off: No Battery Installed)
Battery 2
should be one of
the following:
(Green: Greater than 25% charge
remaining)
(Yellow: 10 to 25% charge remaining)
(Red: Less than 10% charge remaining)